East Central RailwayIn Progress

Construction of two girder bridges at Km 300/7-8 and Km 301/7-8 of 1x61m span OWG each between Valmikinagar Road station and Paniyahwa section in connection with operation of Railway line passing through Valmikinagar Tiger Reserve (VTR) in West Champaran district.

Work #315
As of June 2026

Estimate Cost

₹34.04 Cr

Sanctioned estimate

Tendered Cost

₹35.11 Cr

+3.1% vs estimate

Physical Progress

61%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹35.11 Cr
Progress61%
Started25-10-2018
Target DOC31-05-2026
Vijay Kumar, CE/C/NE/MHX; Kumar Sanu Raj, Dy. CE/Con/SMI; Milan Kumar, AEN/C/NKE

Work Details

5 Fields
Work No.
315
Agency
Aditya-Chankya (JV)
Flat no 102, Divya Apartment, Ashiyana Digha Road, Patna
Acceptance / LOA
LOA No ECR/CAO/Con/North/ETN 27-18-19/6191 dated 10.10.2018
Officer in Charge
Vijay Kumar, CE/C/NE/MHX; Kumar Sanu Raj, Dy. CE/Con/SMI; Milan Kumar, AEN/C/NKE
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹34.04 Cr
Tendered Cost
₹35.11 Cr
Physical Progress
61%
Date Started
25-10-2018
Original DOC
31-05-2026
Extended DOC
N/A

Construction of two girder bridges at Km 300/7-8 and Km 301/7-8 of 1x61m span OWG each between Valmikinagar Road station and Paniyahwa section in connection with operation of Railway line passing through Valmikinagar Tiger Reserve (VTR) in West Champaran district. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Aditya-Chankya (JV). The tendered cost of the work is ₹35.11 Cr, and it is currently In Progress with physical progress recorded at 61%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Construction of two girder bridges at Km 300/7-8 and Km 301/7-8 of 1x61m span OW"?
Status: In Progress. This East Central Railway work is being executed by M/s Aditya-Chankya (JV). Physical progress stands at 61%. Current date of completion (DOC): 31-05-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is M/s Aditya-Chankya (JV), Flat no 102, Divya Apartment, Ashiyana Digha Road, Patna. Acceptance / agreement reference: LOA No ECR/CAO/Con/North/ETN 27-18-19/6191 dated 10.10.2018. Work started on 25-10-2018.
QWhat is the cost of this railway work?
The tendered cost of "Construction of two girder bridges at Km 300/7-8 and Km 301/" is ₹35.11 Cr (against an estimate of ₹34.04 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Construction of two girder bridges at Km 300/7-8 and Km 301/" is one of hundreds of railway works covered.