Supplying and spreading of blanketing material and ballast, BG track linking on diversion of Br. No. 45, 54 and 62 of RXL-NKE section including transportation of P.way material, dismantling of track, stacking of released materials in connection with Gauge conversion of JYG-DBG-NKE-BKF, section.
Estimate Cost
₹9.75 Cr
Sanctioned estimate
Tendered Cost
₹10.01 Cr
+2.7% vs estimate
Physical Progress
30%
Work completed
Status
In Progress
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsSupplying and spreading of blanketing material and ballast, BG track linking on diversion of Br. No. 45, 54 and 62 of RXL-NKE section including transportation of P.way material, dismantling of track, stacking of released materials in connection with Gauge conversion of JYG-DBG-NKE-BKF, section. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s A K CONSTRUCTION BEGUSARAI BIHAT IBRAHIMPUR BEGUSARAI BEGU…. The tendered cost of the work is ₹10.01 Cr, and it is currently In Progress with physical progress recorded at 30%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Remarks
Work in progress.
Frequently Asked Questions
- QWhat is the current status of the railway work "Supplying and spreading of blanketing material and ballast, BG track linking on "?
- Status: In Progress. This East Central Railway work is being executed by M/s A K CONSTRUCTION BEGUSARAI BIHAT IBRAHIMPUR BEGUSARAI BEGU…. Physical progress stands at 30%. Current date of completion (DOC): 30-04-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s A K CONSTRUCTION BEGUSARAI BIHAT IBRAHIMPUR BEGUSARAI BEGUSARAI- 851135 Bihar, India. Acceptance / agreement reference: LOA No: CAO-C-HQ-ENGINEERING/ECR-CAO-C-N-ETN-36-22-23/00891750067769 Dated: 14/12/2022. Work started on 14-12-2022.
- QWhat is the cost of this railway work?
- The tendered cost of "Supplying and spreading of blanketing material and ballast, " is ₹10.01 Cr (against an estimate of ₹9.75 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Supplying and spreading of blanketing material and ballast, " is one of hundreds of railway works covered.