Construction of Station cum S&T building gate lodges, PF sheds, Foot over bridges Passenger Platform, Station approach roads, level crossing roads, Supplying and fixing of lifting barriers, yard brains, circulating area, Deep tube well, construction and fixing of various sectional boards and other allied and miscellaneous works between Narkatiaganj (excluding) to Harinagar (including) in connection with NKE-VKNR doubling project.
Estimate Cost
₹26.27 Cr
Sanctioned estimate
Tendered Cost
₹30.13 Cr
+14.7% vs estimate
Physical Progress
95%
Work completed
Status
Overdue
Past target DOC
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsConstruction of Station cum S&T building gate lodges, PF sheds, Foot over bridges Passenger Platform, Station approach roads, level crossing roads, Supplying and fixing of lifting barriers, yard brains, circulating area, Deep tube well, construction and fixing of various sectional boards and other allied and miscellaneous works between Narkatiaganj (excluding) to Harinagar (including) in connection with NKE-VKNR doubling project. is an East Central Railway (ECR) infrastructure work in Bihar, executed by CANDC (JV). The tendered cost of the work is ₹30.13 Cr, and it is currently Overdue with physical progress recorded at 95%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Remarks
Work in progress.
Frequently Asked Questions
- QWhat is the current status of the railway work "Construction of Station cum S&T building gate lodges, PF sheds, Foot over bridge"?
- Status: Overdue (overdue). This East Central Railway work is being executed by CANDC (JV). Physical progress stands at 95%. Current date of completion (DOC): 31-12-2025.
- QWho is the agency for this Bihar railway project?
- The agency for this work is CANDC (JV), Supriya Cinema Road, Shanti Nagar, Bettiah, West Champaran. Acceptance / agreement reference: CA. No. ECR/CAO/CON/NORTH/ETN-66-19-20 date 24.02.2020. Work started on 15-03-2020.
- QWhat is the cost of this railway work?
- The tendered cost of "Construction of Station cum S&T building gate lodges, PF she" is ₹30.13 Cr (against an estimate of ₹26.27 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Construction of Station cum S&T building gate lodges, PF she" is one of hundreds of railway works covered.