East Central RailwayOverdue

Construction of Station cum S&T building gate lodges, PF sheds, Foot over bridges Passenger Platform, Station approach roads, level crossing roads, Supplying and fixing of lifting barriers, yard brains, circulating area, Deep tube well, construction and fixing of various sectional boards and other allied and miscellaneous works between Narkatiaganj (excluding) to Harinagar (including) in connection with NKE-VKNR doubling project.

Work #147
As of March 2026

Estimate Cost

₹26.27 Cr

Sanctioned estimate

Tendered Cost

₹30.13 Cr

+14.7% vs estimate

Physical Progress

95%

Work completed

Status

Overdue

Past target DOC

East Central Railway — CAO (Con)Overdue
Tendered₹30.13 Cr
Progress95%
Started15-03-2020
Target DOC31-12-2025
Indrajeet Kumar CE/C/NW/MHX; Kumar Sanu Raj, Dy. CE/Con/SMI; Harinandan Ram AEN/C/NKE

Work Details

5 Fields
Work No.
147
Agency
CANDC (JV)
Supriya Cinema Road, Shanti Nagar, Bettiah, West Champaran
Acceptance / LOA
CA. No. ECR/CAO/CON/NORTH/ETN-66-19-20 date 24.02.2020
Officer in Charge
Indrajeet Kumar CE/C/NW/MHX; Kumar Sanu Raj, Dy. CE/Con/SMI; Harinandan Ram AEN/C/NKE
Report Period
March 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹26.27 Cr
Tendered Cost
₹30.13 Cr
Physical Progress
95%
Date Started
15-03-2020
Original DOC
31-12-2025
Extended DOC
N/A

Construction of Station cum S&T building gate lodges, PF sheds, Foot over bridges Passenger Platform, Station approach roads, level crossing roads, Supplying and fixing of lifting barriers, yard brains, circulating area, Deep tube well, construction and fixing of various sectional boards and other allied and miscellaneous works between Narkatiaganj (excluding) to Harinagar (including) in connection with NKE-VKNR doubling project. is an East Central Railway (ECR) infrastructure work in Bihar, executed by CANDC (JV). The tendered cost of the work is ₹30.13 Cr, and it is currently Overdue with physical progress recorded at 95%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

Work in progress.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Construction of Station cum S&T building gate lodges, PF sheds, Foot over bridge"?
Status: Overdue (overdue). This East Central Railway work is being executed by CANDC (JV). Physical progress stands at 95%. Current date of completion (DOC): 31-12-2025.
QWho is the agency for this Bihar railway project?
The agency for this work is CANDC (JV), Supriya Cinema Road, Shanti Nagar, Bettiah, West Champaran. Acceptance / agreement reference: CA. No. ECR/CAO/CON/NORTH/ETN-66-19-20 date 24.02.2020. Work started on 15-03-2020.
QWhat is the cost of this railway work?
The tendered cost of "Construction of Station cum S&T building gate lodges, PF she" is ₹30.13 Cr (against an estimate of ₹26.27 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Construction of Station cum S&T building gate lodges, PF she" is one of hundreds of railway works covered.