Manufacturing, fabricating, Installation of glued insulated joint 60Kg/52Kg (In situ) between Narkatiaganj-Valmikinagar in connection with doubling project of NKE-VKNR under jurisdiction of DY.CE/Con/NKE
Estimate Cost
₹1.48 Cr
Sanctioned estimate
Tendered Cost
₹1.48 Cr
0.0% vs estimate
Physical Progress
77%
Work completed
Status
In Progress
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsManufacturing, fabricating, Installation of glued insulated joint 60Kg/52Kg (In situ) between Narkatiaganj-Valmikinagar in connection with doubling project of NKE-VKNR under jurisdiction of DY.CE/Con/NKE is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Eden Vinimay Private Limited-Kolkata. The tendered cost of the work is ₹1.48 Cr, and it is currently In Progress with physical progress recorded at 77%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Frequently Asked Questions
- QWhat is the current status of the railway work "Manufacturing, fabricating, Installation of glued insulated joint 60Kg/52Kg (In "?
- Status: In Progress. This East Central Railway work is being executed by M/s Eden Vinimay Private Limited-Kolkata. Physical progress stands at 77%. Current date of completion (DOC): 15-06-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s Eden Vinimay Private Limited-Kolkata, 22 Strand Road, Ground Floor, Kolkata-700001, West Bengal, India. Acceptance / agreement reference: CAO-C-HQ-ENGINEERING/ECR-CAO-C-N-ETN-52-20-21/00922790033972. Work started on 22-03-2022.
- QWhat is the cost of this railway work?
- The tendered cost of "Manufacturing, fabricating, Installation of glued insulated " is ₹1.48 Cr (against an estimate of ₹1.48 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Manufacturing, fabricating, Installation of glued insulated " is one of hundreds of railway works covered.