Loading, unloadong, leading and carting of all types of Rail, PSC sleepers and P way fittings in block section, station yard (New/relased), boulder pitching on slopes at nominated locations under the juridiction of Dy. CE/Con/NKE in connection with doubling of NKE-VKNR and GC work of JYG-DBG-NKE-GAH section.
Estimate Cost
₹29.19 Cr
Sanctioned estimate
Tendered Cost
₹27.21 Cr
-6.8% vs estimate
Physical Progress
40%
Work completed
Status
Overdue
Past target DOC
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsLoading, unloadong, leading and carting of all types of Rail, PSC sleepers and P way fittings in block section, station yard (New/relased), boulder pitching on slopes at nominated locations under the juridiction of Dy. CE/Con/NKE in connection with doubling of NKE-VKNR and GC work of JYG-DBG-NKE-GAH section. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/S J. K. Constructuin. The tendered cost of the work is ₹27.21 Cr, and it is currently Overdue with physical progress recorded at 40%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Remarks
Work in progress.
Frequently Asked Questions
- QWhat is the current status of the railway work "Loading, unloadong, leading and carting of all types of Rail, PSC sleepers and P"?
- Status: Overdue (overdue). This East Central Railway work is being executed by M/S J. K. Constructuin. Physical progress stands at 40%. Current date of completion (DOC): 31-12-2025.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/S J. K. Constructuin, CO. Bikaner, Naya Bazar Nokha, Bikaner - 334803, Rajsthan, India. Acceptance / agreement reference: LOA No.- CAO-C-HQ-Engineering/ECR-CAO-C-N-ETN-131-19-20/00910990019012 dt.-12.05.2020. Work started on 08-08-2020.
- QWhat is the cost of this railway work?
- The tendered cost of "Loading, unloadong, leading and carting of all types of Rail" is ₹27.21 Cr (against an estimate of ₹29.19 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Loading, unloadong, leading and carting of all types of Rail" is one of hundreds of railway works covered.