East Central RailwayOverdue

Loading, unloadong, leading and carting of all types of Rail, PSC sleepers and P way fittings in block section, station yard (New/relased), boulder pitching on slopes at nominated locations under the juridiction of Dy. CE/Con/NKE in connection with doubling of NKE-VKNR and GC work of JYG-DBG-NKE-GAH section.

Work #146
As of March 2026

Estimate Cost

₹29.19 Cr

Sanctioned estimate

Tendered Cost

₹27.21 Cr

-6.8% vs estimate

Physical Progress

40%

Work completed

Status

Overdue

Past target DOC

East Central Railway — CAO (Con)Overdue
Tendered₹27.21 Cr
Progress40%
Started08-08-2020
Target DOC31-12-2025
Indrajeet Kumar CE/C/NW/MHX; Kumar Sanu Raj, Dy. CE/Con/SMI; Milan Kumar AEN/C/NKE

Work Details

5 Fields
Work No.
146
Agency
J. K. Constructuin
CO. Bikaner, Naya Bazar Nokha, Bikaner - 334803, Rajsthan, India
Acceptance / LOA
LOA No.- CAO-C-HQ-Engineering/ECR-CAO-C-N-ETN-131-19-20/00910990019012 dt.-12.05.2020
Officer in Charge
Indrajeet Kumar CE/C/NW/MHX; Kumar Sanu Raj, Dy. CE/Con/SMI; Milan Kumar AEN/C/NKE
Report Period
March 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹29.19 Cr
Tendered Cost
₹27.21 Cr
Physical Progress
40%
Date Started
08-08-2020
Original DOC
31-12-2025
Extended DOC
N/A

Loading, unloadong, leading and carting of all types of Rail, PSC sleepers and P way fittings in block section, station yard (New/relased), boulder pitching on slopes at nominated locations under the juridiction of Dy. CE/Con/NKE in connection with doubling of NKE-VKNR and GC work of JYG-DBG-NKE-GAH section. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/S J. K. Constructuin. The tendered cost of the work is ₹27.21 Cr, and it is currently Overdue with physical progress recorded at 40%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

Work in progress.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Loading, unloadong, leading and carting of all types of Rail, PSC sleepers and P"?
Status: Overdue (overdue). This East Central Railway work is being executed by M/S J. K. Constructuin. Physical progress stands at 40%. Current date of completion (DOC): 31-12-2025.
QWho is the agency for this Bihar railway project?
The agency for this work is M/S J. K. Constructuin, CO. Bikaner, Naya Bazar Nokha, Bikaner - 334803, Rajsthan, India. Acceptance / agreement reference: LOA No.- CAO-C-HQ-Engineering/ECR-CAO-C-N-ETN-131-19-20/00910990019012 dt.-12.05.2020. Work started on 08-08-2020.
QWhat is the cost of this railway work?
The tendered cost of "Loading, unloadong, leading and carting of all types of Rail" is ₹27.21 Cr (against an estimate of ₹29.19 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Loading, unloadong, leading and carting of all types of Rail" is one of hundreds of railway works covered.