East Central RailwayIn Progress

Linking BG track, linking track on level crossing, bridge, loading/unloading and spreading of ballast, unloading/loading rails, panel, PSC sleepers, spreading of PSC sleepers/Rails, carting of P.way materials, linking and packing of BG track between Muzaffarpur (excluding)-Mahwal (including) in connection with doubling of MFP-SGL section

Work #266
As of June 2026

Estimate Cost

₹12.52 Cr

Sanctioned estimate

Tendered Cost

₹15.66 Cr

+25.1% vs estimate

Physical Progress

70%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹15.66 Cr
Progress70%
Started26-04-2020
Target DOC31-03-2026
Indrajit Kumar, CE/C/NW/MHX; Avanish Sonu, Dy CE/C/I/HJP; Sri. Ravi Shankar Singh (AEN/Con/MFP-I)

Work Details

5 Fields
Work No.
266
Agency
Brij Nandan Singh-Asansol, Triveni-A
Flat No.-1D, Shristinagar, Asansol-713305
Acceptance / LOA
LOA no CAO-C-HQ-Engineering ECR-CAO-C-N-ETN-54-19-20/00853500017226/1412 dt. 12.03.2020
Officer in Charge
Indrajit Kumar, CE/C/NW/MHX; Avanish Sonu, Dy CE/C/I/HJP; Sri. Ravi Shankar Singh (AEN/Con/MFP-I)
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹12.52 Cr
Tendered Cost
₹15.66 Cr
Physical Progress
70%
Date Started
26-04-2020
Original DOC
11-03-2021
Extended DOC
31-03-2026

Linking BG track, linking track on level crossing, bridge, loading/unloading and spreading of ballast, unloading/loading rails, panel, PSC sleepers, spreading of PSC sleepers/Rails, carting of P.way materials, linking and packing of BG track between Muzaffarpur (excluding)-Mahwal (including) in connection with doubling of MFP-SGL section is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Brij Nandan Singh-Asansol. The tendered cost of the work is ₹15.66 Cr, and it is currently In Progress with physical progress recorded at 70%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Linking BG track, linking track on level crossing, bridge, loading/unloading and"?
Status: In Progress. This East Central Railway work is being executed by M/s Brij Nandan Singh-Asansol. Physical progress stands at 70%. Current date of completion (DOC): 31-03-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is M/s Brij Nandan Singh-Asansol, Triveni-A, Flat No.-1D, Shristinagar, Asansol-713305. Acceptance / agreement reference: LOA no CAO-C-HQ-Engineering ECR-CAO-C-N-ETN-54-19-20/00853500017226/1412 dt. 12.03.2020. Work started on 26-04-2020.
QWhat is the cost of this railway work?
The tendered cost of "Linking BG track, linking track on level crossing, bridge, l" is ₹15.66 Cr (against an estimate of ₹12.52 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Linking BG track, linking track on level crossing, bridge, l" is one of hundreds of railway works covered.