East Central RailwayIn Progress

Construction of foundation, substructure of major bridges and other allied works from Ch. 0.00 to 28.00 between Araria-Raniganj in connection with construction of Araria-Supaul New line in Samastipur division of E.C. Railway.

Estimate Cost

₹99.78 Cr

Sanctioned estimate

Tendered Cost

₹91.57 Cr

-8.2% vs estimate

Physical Progress

44%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹91.57 Cr
Progress44%
Started03-08-2025
Target DOC31-01-2027
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; H R Chaudhary, AEN/C/SRGR

Work Details

5 Fields
Work No.
226
Acceptance / LOA
CAO-C-HQ-ENGINEERING/ECR-CAO-C-N-ETN-27-23-24/00964030096772; ECR/ECRC/Civil/2024/0031, dated 11.05.2024
Officer in Charge
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; H R Chaudhary, AEN/C/SRGR
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹99.78 Cr
Tendered Cost
₹91.57 Cr
Physical Progress
44%
Date Started
03-08-2025
Original DOC
31-01-2027
Extended DOC
N/A

Construction of foundation, substructure of major bridges and other allied works from Ch. 0.00 to 28.00 between Araria-Raniganj in connection with construction of Araria-Supaul New line in Samastipur division of E.C. Railway. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Durga Krishna Store Private Limited-Guwahati. The tendered cost of the work is ₹91.57 Cr, and it is currently In Progress with physical progress recorded at 44%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Construction of foundation, substructure of major bridges and other allied works"?
Status: In Progress. This East Central Railway work is being executed by M/s Durga Krishna Store Private Limited-Guwahati. Physical progress stands at 44%. Current date of completion (DOC): 31-01-2027.
QWho is the agency for this Bihar railway project?
The agency for this work is M/s Durga Krishna Store Private Limited-Guwahati. Acceptance / agreement reference: CAO-C-HQ-ENGINEERING/ECR-CAO-C-N-ETN-27-23-24/00964030096772; ECR/ECRC/Civil/2024/0031, dated 11.05.2024. Work started on 03-08-2025.
QWhat is the cost of this railway work?
The tendered cost of "Construction of foundation, substructure of major bridges an" is ₹91.57 Cr (against an estimate of ₹99.78 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Construction of foundation, substructure of major bridges an" is one of hundreds of railway works covered.