East Central RailwayIn Progress

Construction of foundation and substructure of major bridges 322 (5x30.5m OWG), 352 (2x30.5m OWG) for double track on double D well foundation, sheet piling at Major Bridges of NKE-VKNR section and its allied works in connection with doubling of Narkatiaganj-Valmikinagar Road section.

Work #327
As of June 2026

Estimate Cost

₹72.79 Cr

Sanctioned estimate

Tendered Cost

₹65.37 Cr

-10.2% vs estimate

Physical Progress

62%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹65.37 Cr
Progress62%
Started25-08-2022
Target DOC30-11-2026
Vijay Kumar, CE/C/NE/MHX; Kumar Sanu Raj, Dy. CE/Con/SMI; Milan Kumar, AEN/C/NKE

Work Details

5 Fields
Work No.
327
Agency
Dhariwal Bholeshanker JV
H.N.-193X, Bichhiya Jungle Tulsiram, P.O-PAC Camp, Gorakhpur (U.P.)-273014.
Acceptance / LOA
ECR/CAO/CON/North/ETN-14-22-23 dated 11.08.2022; Online LAO 01530940059918
Officer in Charge
Vijay Kumar, CE/C/NE/MHX; Kumar Sanu Raj, Dy. CE/Con/SMI; Milan Kumar, AEN/C/NKE
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹72.79 Cr
Tendered Cost
₹65.37 Cr
Physical Progress
62%
Date Started
25-08-2022
Original DOC
30-11-2026
Extended DOC
N/A

Construction of foundation and substructure of major bridges 322 (5x30.5m OWG), 352 (2x30.5m OWG) for double track on double D well foundation, sheet piling at Major Bridges of NKE-VKNR section and its allied works in connection with doubling of Narkatiaganj-Valmikinagar Road section. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/S Dhariwal Bholeshanker JV. The tendered cost of the work is ₹65.37 Cr, and it is currently In Progress with physical progress recorded at 62%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Construction of foundation and substructure of major bridges 322 (5x30.5m OWG), "?
Status: In Progress. This East Central Railway work is being executed by M/S Dhariwal Bholeshanker JV. Physical progress stands at 62%. Current date of completion (DOC): 30-11-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is M/S Dhariwal Bholeshanker JV, H.N.-193X, Bichhiya Jungle Tulsiram, P.O-PAC Camp, Gorakhpur (U.P.)-273014.. Acceptance / agreement reference: ECR/CAO/CON/North/ETN-14-22-23 dated 11.08.2022; Online LAO 01530940059918. Work started on 25-08-2022.
QWhat is the cost of this railway work?
The tendered cost of "Construction of foundation and substructure of major bridges" is ₹65.37 Cr (against an estimate of ₹72.79 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Construction of foundation and substructure of major bridges" is one of hundreds of railway works covered.