Final Location Survey (FLS) for New Line between Laheriyasarai-Saharsa stations (approx-100.0 KMs.) via Jamalpur and Mushariya, carrying out detail Engineering survey including leveling, alignment, soil exploration, preparation of plans, L-sections, GAD plans of Bridges etc., bill of quantities, preparation of detailed project report and other related ancillary activities in connection with FLS for New Line between Laheriyasarai-Saharsa station
Estimate Cost
₹2.30 Cr
Sanctioned estimate
Tendered Cost
₹1.71 Cr
-25.7% vs estimate
Physical Progress
55%
Work completed
Status
Overdue
Past target DOC
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsFinal Location Survey (FLS) for New Line between Laheriyasarai-Saharsa stations (approx-100.0 KMs.) via Jamalpur and Mushariya, carrying out detail Engineering survey including leveling, alignment, soil exploration, preparation of plans, L-sections, GAD plans of Bridges etc., bill of quantities, preparation of detailed project report and other related ancillary activities in connection with FLS for New Line between Laheriyasarai-Saharsa station is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Anand Raj Patna. The tendered cost of the work is ₹1.71 Cr, and it is currently Overdue with physical progress recorded at 55%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Remarks
DOC under process
Frequently Asked Questions
- QWhat is the current status of the railway work "Final Location Survey (FLS) for New Line between Laheriyasarai-Saharsa stations "?
- Status: Overdue (overdue). This East Central Railway work is being executed by M/s Anand Raj Patna. Physical progress stands at 55%. Current date of completion (DOC): 02-02-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s Anand Raj Patna. Acceptance / agreement reference: CAO-C-HQ-ENGINEERING/ECR-CAO-C-N-ETN-15-2223/00854630060491 DT-24.08.2022. Work started on 25-04-2023.
- QWhat is the cost of this railway work?
- The tendered cost of "Final Location Survey (FLS) for New Line between Laheriyasar" is ₹1.71 Cr (against an estimate of ₹2.30 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Final Location Survey (FLS) for New Line between Laheriyasar" is one of hundreds of railway works covered.