East Central RailwayIn Progress

Final Location Survey (FLS) for Doubling Line between Narkatiaganj-Raxaul-Sitamarhi-Darbhanga & Sitamarhi-Muzaffarpur section (approx. 255.5 Kms.) and Final Location Survey (FLS) for 3rd & 4th line between Barauni-Bachhwara including Barauni Yard Remodeling (approx. 16 Kms.), Carrying out detail Engineering survey including Leveling, alignment, soil exploration, preparation of plans, L-section, GA plans of Bridges etc., bill of quantities and other related ancillary activities in connection with preparation of DPR in Samastipur division.

Estimate Cost

₹2.53 Cr

Sanctioned estimate

Tendered Cost

₹2.40 Cr

-5.1% vs estimate

Physical Progress

65%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹2.40 Cr
Progress65%
Started04-11-2020
Target DOC31-05-2026
Vijay Kumar, CE/C/NE/MHX; Kumar Sanu Raj, Dy. CE/Con/SMI; Milan Kumar, AEN/C/NKE

Work Details

5 Fields
Work No.
313
Agency
Matrix Geo Solution Pvt. Ltd., New Delhi
47, Sector-13, Pocket-B, Phase-2, Dwarka, New Delhi-110078.
Acceptance / LOA
ECR/CAO/CON/WT/Agt/149 dated 25.01.2021
Officer in Charge
Vijay Kumar, CE/C/NE/MHX; Kumar Sanu Raj, Dy. CE/Con/SMI; Milan Kumar, AEN/C/NKE
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹2.53 Cr
Tendered Cost
₹2.40 Cr
Physical Progress
65%
Date Started
04-11-2020
Original DOC
31-05-2026
Extended DOC
N/A

Final Location Survey (FLS) for Doubling Line between Narkatiaganj-Raxaul-Sitamarhi-Darbhanga & Sitamarhi-Muzaffarpur section (approx. 255.5 Kms.) and Final Location Survey (FLS) for 3rd & 4th line between Barauni-Bachhwara including Barauni Yard Remodeling (approx. 16 Kms.), Carrying out detail Engineering survey including Leveling, alignment, soil exploration, preparation of plans, L-section, GA plans of Bridges etc., bill of quantities and other related ancillary activities in connection with preparation of DPR in Samastipur division. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/S Matrix Geo Solution Pvt. Ltd.. The tendered cost of the work is ₹2.40 Cr, and it is currently In Progress with physical progress recorded at 65%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Final Location Survey (FLS) for Doubling Line between Narkatiaganj-Raxaul-Sitama"?
Status: In Progress. This East Central Railway work is being executed by M/S Matrix Geo Solution Pvt. Ltd.. Physical progress stands at 65%. Current date of completion (DOC): 31-05-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is M/S Matrix Geo Solution Pvt. Ltd., New Delhi, 47, Sector-13, Pocket-B, Phase-2, Dwarka, New Delhi-110078.. Acceptance / agreement reference: ECR/CAO/CON/WT/Agt/149 dated 25.01.2021. Work started on 04-11-2020.
QWhat is the cost of this railway work?
The tendered cost of "Final Location Survey (FLS) for Doubling Line between Narkat" is ₹2.40 Cr (against an estimate of ₹2.53 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Final Location Survey (FLS) for Doubling Line between Narkat" is one of hundreds of railway works covered.