East Central RailwayIn Progress

Earthwork in embankment, blanketing, contruction of minor bridges, RUB, LHS and other allied misc. works between Raniganj station (Excl.) to Manolapatti Halt (Incl.) i.e. from Km 28.000 to Km 36.000 in connection with construction of new B.G. Rail line between Araria-Supaul.

Work #63
As of March 2026

Estimate Cost

₹99.58 Cr

Sanctioned estimate

Tendered Cost

₹89.57 Cr

-10.1% vs estimate

Physical Progress

11%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹89.57 Cr
Progress11%
Started20-01-2025
Target DOC30-06-2026
Mahboob Alam CE/C/NC/MHX; Sri Pankaj Kumar Dy CE/C/III/SPJ; Sri A K Sinha AEN/C/DBG

Work Details

5 Fields
Work No.
63
Acceptance / LOA
CAO-C-HQ-ENGINEERING/ECR-CAO-C-N-ETN-29-23-24/01540740104181
Officer in Charge
Mahboob Alam CE/C/NC/MHX; Sri Pankaj Kumar Dy CE/C/III/SPJ; Sri A K Sinha AEN/C/DBG
Report Period
March 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹99.58 Cr
Tendered Cost
₹89.57 Cr
Physical Progress
11%
Date Started
20-01-2025
Original DOC
30-06-2026
Extended DOC
N/A

Earthwork in embankment, blanketing, contruction of minor bridges, RUB, LHS and other allied misc. works between Raniganj station (Excl.) to Manolapatti Halt (Incl.) i.e. from Km 28.000 to Km 36.000 in connection with construction of new B.G. Rail line between Araria-Supaul. is an East Central Railway (ECR) infrastructure work in Bihar, executed by NNT DEVELOPERS PRIVATE LIMITED-PATNA. The tendered cost of the work is ₹89.57 Cr, and it is currently In Progress with physical progress recorded at 11%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

Work in progress

?

Frequently Asked Questions

QWhat is the current status of the railway work "Earthwork in embankment, blanketing, contruction of minor bridges, RUB, LHS and "?
Status: In Progress. This East Central Railway work is being executed by NNT DEVELOPERS PRIVATE LIMITED-PATNA. Physical progress stands at 11%. Current date of completion (DOC): 30-06-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is NNT DEVELOPERS PRIVATE LIMITED-PATNA. Acceptance / agreement reference: CAO-C-HQ-ENGINEERING/ECR-CAO-C-N-ETN-29-23-24/01540740104181. Work started on 20-01-2025.
QWhat is the cost of this railway work?
The tendered cost of "Earthwork in embankment, blanketing, contruction of minor br" is ₹89.57 Cr (against an estimate of ₹99.58 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Earthwork in embankment, blanketing, contruction of minor br" is one of hundreds of railway works covered.