East Central RailwayIn Progress

E-Tender No. ECR-CAO-C-N-ETN-93-19-20 for the work of "Supply of portion and welding of 60 KG/52 KG (New/SH, 90/72 uts) rail joints by SKV process (25mm gap) on cess/in situ as per IRS specification T-19-19945 (latest version) in block/non-block period with contractors material, labour, T&P etc. Including welding, supervisor completed between Narkatiaganj (excluding) to Gaunaha (including) section in connection with Narkatiaganj-Gauge conversion of JYG-DBG-NKE-BKF gauge conversion work) and SGL-NKE doubling project (Km.186/200-246/00).

Estimate Cost

₹3.96 Cr

Sanctioned estimate

Tendered Cost

₹6.01 Cr

+51.8% vs estimate

Physical Progress

80%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹6.01 Cr
Progress80%
Started04-06-2020
Target DOC31-10-2026
Sri Indrajit Kumar, CE/C/NW; Sri Ajay Kumar, Dy.CE/C/BTH; Sri Nirmal Shalhata, AEN/Con/II/BTH

Work Details

5 Fields
Work No.
307
Agency
The India Thermit Corporation Limited, Kanpur
84/22 Fazalganj, Kanpur-208012, Uttar Pradesh, India
Acceptance / LOA
ECR-CAO-C-N-ETN-93-19-20 dated. 04/06/2020
Officer in Charge
Sri Indrajit Kumar, CE/C/NW; Sri Ajay Kumar, Dy.CE/C/BTH; Sri Nirmal Shalhata, AEN/Con/II/BTH
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹3.96 Cr
Tendered Cost
₹6.01 Cr
Physical Progress
80%
Date Started
04-06-2020
Original DOC
03-06-2021
Extended DOC
31-10-2026

E-Tender No. ECR-CAO-C-N-ETN-93-19-20 for the work of "Supply of portion and welding of 60 KG/52 KG (New/SH, 90/72 uts) rail joints by SKV process (25mm gap) on cess/in situ as per IRS specification T-19-19945 (latest version) in block/non-block period with contractors material, labour, T&P etc. Including welding, supervisor completed between Narkatiaganj (excluding) to Gaunaha (including) section in connection with Narkatiaganj-Gauge conversion of JYG-DBG-NKE-BKF gauge conversion work) and SGL-NKE doubling project (Km.186/200-246/00). is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s The India Thermit Corporation Limited. The tendered cost of the work is ₹6.01 Cr, and it is currently In Progress with physical progress recorded at 80%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

estimate_cost_crore raw: 3.96 (SGL-NKE doubling only)

?

Frequently Asked Questions

QWhat is the current status of the railway work "E-Tender No. ECR-CAO-C-N-ETN-93-19-20 for the work of "Supply of portion and wel"?
Status: In Progress. This East Central Railway work is being executed by M/s The India Thermit Corporation Limited. Physical progress stands at 80%. Current date of completion (DOC): 31-10-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is M/s The India Thermit Corporation Limited, Kanpur, 84/22 Fazalganj, Kanpur-208012, Uttar Pradesh, India. Acceptance / agreement reference: ECR-CAO-C-N-ETN-93-19-20 dated. 04/06/2020. Work started on 04-06-2020.
QWhat is the cost of this railway work?
The tendered cost of "E-Tender No. ECR-CAO-C-N-ETN-93-19-20 for the work of "Suppl" is ₹6.01 Cr (against an estimate of ₹3.96 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "E-Tender No. ECR-CAO-C-N-ETN-93-19-20 for the work of "Suppl" is one of hundreds of railway works covered.