E-Tender No. ECR-CAO-C-N-ETN-93-19-20 for the work of "Supply of portion and welding of 60 KG/52 KG (New/SH, 90/72 uts) rail joints by SKV process (25mm gap) on cess/in situ as per IRS specification T-19-19945 (latest version) in block/non-block period with contractors material, labour, T&P etc. Including welding, supervisor completed between Narkatiaganj (excluding) to Gaunaha (including) section in connection with Narkatiaganj-Gauge conversion of JYG-DBG-NKE-BKF gauge conversion work) and SGL-NKE doubling project (Km.186/200-246/00).
Estimate Cost
₹3.96 Cr
Sanctioned estimate
Tendered Cost
₹6.01 Cr
+51.8% vs estimate
Physical Progress
80%
Work completed
Status
In Progress
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsE-Tender No. ECR-CAO-C-N-ETN-93-19-20 for the work of "Supply of portion and welding of 60 KG/52 KG (New/SH, 90/72 uts) rail joints by SKV process (25mm gap) on cess/in situ as per IRS specification T-19-19945 (latest version) in block/non-block period with contractors material, labour, T&P etc. Including welding, supervisor completed between Narkatiaganj (excluding) to Gaunaha (including) section in connection with Narkatiaganj-Gauge conversion of JYG-DBG-NKE-BKF gauge conversion work) and SGL-NKE doubling project (Km.186/200-246/00). is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s The India Thermit Corporation Limited. The tendered cost of the work is ₹6.01 Cr, and it is currently In Progress with physical progress recorded at 80%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Remarks
estimate_cost_crore raw: 3.96 (SGL-NKE doubling only)
Frequently Asked Questions
- QWhat is the current status of the railway work "E-Tender No. ECR-CAO-C-N-ETN-93-19-20 for the work of "Supply of portion and wel"?
- Status: In Progress. This East Central Railway work is being executed by M/s The India Thermit Corporation Limited. Physical progress stands at 80%. Current date of completion (DOC): 31-10-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s The India Thermit Corporation Limited, Kanpur, 84/22 Fazalganj, Kanpur-208012, Uttar Pradesh, India. Acceptance / agreement reference: ECR-CAO-C-N-ETN-93-19-20 dated. 04/06/2020. Work started on 04-06-2020.
- QWhat is the cost of this railway work?
- The tendered cost of "E-Tender No. ECR-CAO-C-N-ETN-93-19-20 for the work of "Suppl" is ₹6.01 Cr (against an estimate of ₹3.96 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "E-Tender No. ECR-CAO-C-N-ETN-93-19-20 for the work of "Suppl" is one of hundreds of railway works covered.