E-Tender No. ECR-CAO-C-N-ETN-31-21-22 closing date 30-12-2021 for Supplying and stacking of machine crushed stone track ballast Pakur/Sahebganj Range as per Railway/RDSO specification on cess and spreading the same on formation between Bettiah-Sathi (Approx Km.210/00 to Km. 235/00) including loop line of KUMB and CAI yard in connection with doubling of Sagauli-Valmikinagar doubling project under Dy.CE/C/BTH.
Estimate Cost
₹12.98 Cr
Sanctioned estimate
Tendered Cost
₹11.25 Cr
-13.3% vs estimate
Physical Progress
100%
Work completed
Status
Completed
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsE-Tender No. ECR-CAO-C-N-ETN-31-21-22 closing date 30-12-2021 for Supplying and stacking of machine crushed stone track ballast Pakur/Sahebganj Range as per Railway/RDSO specification on cess and spreading the same on formation between Bettiah-Sathi (Approx Km.210/00 to Km. 235/00) including loop line of KUMB and CAI yard in connection with doubling of Sagauli-Valmikinagar doubling project under Dy.CE/C/BTH. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Bajrang Infrastructure and Construction Private Limited-Patna. The tendered cost of the work is ₹11.25 Cr, and it is currently Completed with physical progress recorded at 100%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Remarks
progress note: 100% (Work physically completed.)
Frequently Asked Questions
- QWhat is the current status of the railway work "E-Tender No. ECR-CAO-C-N-ETN-31-21-22 closing date 30-12-2021 for Supplying and "?
- Status: Completed. This East Central Railway work is being executed by M/s Bajrang Infrastructure and Construction Private Limited-Patna. Physical progress stands at 100%. Current date of completion (DOC): 30-04-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s Bajrang Infrastructure and Construction Private Limited-Patna. Acceptance / agreement reference: ECR-CAO-C-N-ETN-31-21-22/00998150050868 Dated. 09.03.2022. Work started on 10-12-2022.
- QWhat is the cost of this railway work?
- The tendered cost of "E-Tender No. ECR-CAO-C-N-ETN-31-21-22 closing date 30-12-202" is ₹11.25 Cr (against an estimate of ₹12.98 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "E-Tender No. ECR-CAO-C-N-ETN-31-21-22 closing date 30-12-202" is one of hundreds of railway works covered.