Balance earthwork, Blanketing work in embankment and construction of minor bridges/RUBs from Sahebganj to Madhubani in connection with construction of Hajipur-Sagauli new BG rail line project.
Estimate Cost
₹89.48 Cr
Sanctioned estimate
Tendered Cost
₹78.61 Cr
-12.1% vs estimate
Physical Progress
34%
Work completed
Status
In Progress
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsBalance earthwork, Blanketing work in embankment and construction of minor bridges/RUBs from Sahebganj to Madhubani in connection with construction of Hajipur-Sagauli new BG rail line project. is an East Central Railway (ECR) infrastructure work in Bihar, executed by GVV Constructions Private Limited-Bhubaneswar. The tendered cost of the work is ₹78.61 Cr, and it is currently In Progress with physical progress recorded at 34%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Remarks
tendered_cost_crore raw: 78.61 after 1st variation value 110.59
Frequently Asked Questions
- QWhat is the current status of the railway work "Balance earthwork, Blanketing work in embankment and construction of minor bridg"?
- Status: In Progress. This East Central Railway work is being executed by GVV Constructions Private Limited-Bhubaneswar. Physical progress stands at 34%. Current date of completion (DOC): 31-12-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is GVV Constructions Private Limited-Bhubaneswar, Plot No 358 Saheed Nagar, Bhubaneswar, Odisha-751007, India. Acceptance / agreement reference: CAO-C-HQ-ENGINEERING / ECR-CAO-C-N-ETN-02-24-25 / 00910690103878 dt 27.05.24. Work started on 27-05-2024.
- QWhat is the cost of this railway work?
- The tendered cost of "Balance earthwork, Blanketing work in embankment and constru" is ₹78.61 Cr (against an estimate of ₹89.48 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Balance earthwork, Blanketing work in embankment and constru" is one of hundreds of railway works covered.