Assembling & Erection (by suitable method) of Open Web Girders and Supply, Fabrication & Erection (by suitable method) of Side Pathway, End Raker Ladder and Topchord pathway of Bridge No.14 (14 x 30.50 m), Bridge No.15 (3 x 45.70 m), Bridge No.15A (1 X 45.70 m), Bridge No.16 (6 X 30.50 m) & Bridge No.17 (4 x 45.70 m) spans for 25 Tonne Loading Standard and Supply of H-Beams and Track Linking on OWG Bridges between Rambharderpur-Hayaghat-Thalwara Stations in connection with Doubling of Samastipur-Darbhanga section in Samastipur Division of East Central Railway.
Estimate Cost
₹30.00 Cr
Sanctioned estimate
Tendered Cost
₹30.00 Cr
0.0% vs estimate
Physical Progress
80%
Work completed
Status
In Progress
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsAssembling & Erection (by suitable method) of Open Web Girders and Supply, Fabrication & Erection (by suitable method) of Side Pathway, End Raker Ladder and Topchord pathway of Bridge No.14 (14 x 30.50 m), Bridge No.15 (3 x 45.70 m), Bridge No.15A (1 X 45.70 m), Bridge No.16 (6 X 30.50 m) & Bridge No.17 (4 x 45.70 m) spans for 25 Tonne Loading Standard and Supply of H-Beams and Track Linking on OWG Bridges between Rambharderpur-Hayaghat-Thalwara Stations in connection with Doubling of Samastipur-Darbhanga section in Samastipur Division of East Central Railway. is an East Central Railway (ECR) infrastructure work in Bihar, executed by Hari Construction and Associates Pvt. Ltd.. The tendered cost of the work is ₹30.00 Cr, and it is currently In Progress with physical progress recorded at 80%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Frequently Asked Questions
- QWhat is the current status of the railway work "Assembling & Erection (by suitable method) of Open Web Girders and Supply, Fabri"?
- Status: In Progress. This East Central Railway work is being executed by Hari Construction and Associates Pvt. Ltd.. Physical progress stands at 80%. Current date of completion (DOC): 30-06-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is Hari Construction and Associates Pvt. Ltd., At. & Po.-Keshawe, P.S.: Barauni, Distt.: Begusarai, Bihar-851134. Acceptance / agreement reference: ECR/ECRC/Civil/2024/0077. Work started on 21-05-2025.
- QWhat is the cost of this railway work?
- The tendered cost of "Assembling & Erection (by suitable method) of Open Web Girde" is ₹30.00 Cr (against an estimate of ₹30.00 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Assembling & Erection (by suitable method) of Open Web Girde" is one of hundreds of railway works covered.