East Central RailwayIn Progress

Assembling & Erection (by suitable method) of Open Web Girders and Supply, Fabrication & Erection (by suitable method) of Side Pathway, End Raker Ladder and Topchord pathway of Bridge No.14 (14 x 30.50 m), Bridge No.15 (3 x 45.70 m), Bridge No.15A (1 X 45.70 m), Bridge No.16 (6 X 30.50 m) & Bridge No.17 (4 x 45.70 m) spans for 25 Tonne Loading Standard and Supply of H-Beams and Track Linking on OWG Bridges between Rambharderpur-Hayaghat-Thalwara Stations in connection with Doubling of Samastipur-Darbhanga section in Samastipur Division of East Central Railway.

Estimate Cost

₹30.00 Cr

Sanctioned estimate

Tendered Cost

₹30.00 Cr

0.0% vs estimate

Physical Progress

80%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹30.00 Cr
Progress80%
Started21-05-2025
Target DOC30-06-2026
Mahboob Alam, CE/C/NC/MHX; Mantu Kumar, Dy CE/C/I/SPJ; Rakesh Ranjan, AEN/C/SPJ

Work Details

5 Fields
Work No.
187
Agency
Hari Construction and Associates Pvt. Ltd., At. & Po.-Keshawe
P.S.: Barauni, Distt.: Begusarai, Bihar-851134
Acceptance / LOA
ECR/ECRC/Civil/2024/0077
Officer in Charge
Mahboob Alam, CE/C/NC/MHX; Mantu Kumar, Dy CE/C/I/SPJ; Rakesh Ranjan, AEN/C/SPJ
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹30.00 Cr
Tendered Cost
₹30.00 Cr
Physical Progress
80%
Date Started
21-05-2025
Original DOC
30-06-2026
Extended DOC
N/A

Assembling & Erection (by suitable method) of Open Web Girders and Supply, Fabrication & Erection (by suitable method) of Side Pathway, End Raker Ladder and Topchord pathway of Bridge No.14 (14 x 30.50 m), Bridge No.15 (3 x 45.70 m), Bridge No.15A (1 X 45.70 m), Bridge No.16 (6 X 30.50 m) & Bridge No.17 (4 x 45.70 m) spans for 25 Tonne Loading Standard and Supply of H-Beams and Track Linking on OWG Bridges between Rambharderpur-Hayaghat-Thalwara Stations in connection with Doubling of Samastipur-Darbhanga section in Samastipur Division of East Central Railway. is an East Central Railway (ECR) infrastructure work in Bihar, executed by Hari Construction and Associates Pvt. Ltd.. The tendered cost of the work is ₹30.00 Cr, and it is currently In Progress with physical progress recorded at 80%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Assembling & Erection (by suitable method) of Open Web Girders and Supply, Fabri"?
Status: In Progress. This East Central Railway work is being executed by Hari Construction and Associates Pvt. Ltd.. Physical progress stands at 80%. Current date of completion (DOC): 30-06-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is Hari Construction and Associates Pvt. Ltd., At. & Po.-Keshawe, P.S.: Barauni, Distt.: Begusarai, Bihar-851134. Acceptance / agreement reference: ECR/ECRC/Civil/2024/0077. Work started on 21-05-2025.
QWhat is the cost of this railway work?
The tendered cost of "Assembling & Erection (by suitable method) of Open Web Girde" is ₹30.00 Cr (against an estimate of ₹30.00 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Assembling & Erection (by suitable method) of Open Web Girde" is one of hundreds of railway works covered.