Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
All NHAI Projects
27,27,122EPC 1053 Drone Frames

Permanent rectification of 4 Nos. of blackspots on NH-27 (old NH-28) of Kotwa – Mehsi - Muzaffarpur Section from Km 440.00 to Km 520.00 (Total length 80.00 Km); 4 nos. of blackspot on NH-27 of Muzaffarpur – Darbhanga – Purnia section (Km.0.00 to Km 148.550 and Km 159.357 to Km 287.860) (total length 277.053 Km.) & 1 No of at -grade junction removal near Satanpur junction in Satanpur Village on NH-122 in the state of Bihar on EPC mode.

UPC: N/02023/01004/BR

Physical Progress

50.6%

Drone-monitored

Financial Progress

45.9%

Of awarded cost

Awarded Cost

₹236 Cr

Contract value

Length

10.259 km

Road stretch

Schedule

On Track

On schedule

Drone Frames

1053

Aerial captures

Project Progress

Physical Progress50.6%
Financial Progress45.9%

Stage

Under Construction (AD issued)

Due Date

18-11-2026

Likely Date

18-11-2026

Completion

50.6%

Physical Done

DoneRemaining

Project Timeline

Awarded

19-11-2024

Construction Started

19-11-2024

In Progress

Near Completion

-

Completed

18-11-2026

Physical vs Financial Progress

Project Details

UPC

N/02023/01004/BR

National Highway

27,27,122

Regional Office

RO-Patna

State

Bihar

Mode

EPC

Length

10.259 km

Contractor

Dhariwal Buildtech Limited

Project Stage

Under Construction (AD issued)

Drone Frames

1053 frames

Last Flight

2026-02-24

Cost & Timeline

Awarded Cost

₹236.25 Cr

Capital Cost

N/A

Start Date

19-11-2024

PCOD Date

-

Scheduled Completion

18-11-2026

Likely Completion

18-11-2026

Schedule Status

On schedule

Slippage Days

N/A

Data Updated

2026-06-16 21:08:10

Contractor Profile

Dhariwal Buildtech Limited

RO-Patna27,27,122EPC

Project Intelligence

1

Project is more than halfway complete at 50.6% physical progress.

2

Project is on schedule or ahead of planned completion date.

3

Covers 10.259 km on 27,27,122, improving regional connectivity.

4

1053 drone frames uploaded — real-time aerial monitoring is active for this project.

Permanent rectification of 4 Nos. of blackspots on NH-27 (old NH-28) of Kotwa – Mehsi - Muzaffarpur Section from Km 440.00 to Km 520.00 (Total length 80.00 Km); 4 nos. of blackspot on NH-27 of Muzaffarpur – Darbhanga – Purnia section (Km.0.00 to Km 148.550 and Km 159.357 to Km 287.860) (total length 277.053 Km.) & 1 No of at -grade junction removal near Satanpur junction in Satanpur Village on NH-122 in the state of Bihar on EPC mode. is a National Highways Authority of India (NHAI) project on 27,27,122 in Bihar. The project has an awarded cost of ₹236.25 Cr and is currently ongoing with physical progress at 50.6%.

NHAI tracks physical progress on this project through periodic drone surveys, providing an independent view of on-ground construction status. Other projects on the same highway are listed below.

Drone Imagery Available

1,053 frames · NHAI surveillance footage · UPC N/02023/01004/BR

View Drone Images

Frequently Asked Questions

What is the current status of the NHAI project "Permanent rectification of 4 Nos. of blackspots on NH-27 (old NH-28) of Kotwa – "?
Current physical progress: 50.6%. Financial progress: 45.9%. Project stage: Under Construction (AD issued). On schedule. Scheduled completion: 18-11-2026. Likely completion: 18-11-2026.
Who is the contractor for this NHAI highway project?
The contractor for Permanent rectification of 4 Nos. of blackspots on NH-27 (old NH-28) of Kotwa – Mehsi - Muzaffarpur Section from Km 440.00 to Km 520.00 (Total length 80.00 Km); 4 nos. of blackspot on NH-27 of Muzaffarpur – Darbhanga – Purnia section (Km.0.00 to Km 148.550 and Km 159.357 to Km 287.860) (total length 277.053 Km.) & 1 No of at -grade junction removal near Satanpur junction in Satanpur Village on NH-122 in the state of Bihar on EPC mode. is Dhariwal Buildtech Limited. The project is under RO-Patna and covers 10.259 km on 27,27,122.
What is the cost of this NHAI highway project?
The awarded cost is ₹236.25 Crore. Total capital cost: ₹0.00 Crore. The project is on 27,27,122 in Bihar, monitored via drone surveillance by NHAI.
What is UPC N/02023/01004/BR in NHAI?
UPC (Unique Project Code) N/02023/01004/BR refers to "Permanent rectification of 4 Nos. of blackspots on NH-27 (old NH-28) of Kotwa – Mehsi - Muzaffarpur Section from Km 440.00 to Km 520.00 (Total length 80.00 Km); 4 nos. of blackspot on NH-27 of Muzaffarpur – Darbhanga – Purnia section (Km.0.00 to Km 148.550 and Km 159.357 to Km 287.860) (total length 277.053 Km.) & 1 No of at -grade junction removal near Satanpur junction in Satanpur Village on NH-122 in the state of Bihar on EPC mode." — a National Highway project on 27,27,122 in Bihar. NHAI uses UPCs to track drone monitoring progress and physical completion of highway construction.