6L Patna Ring Road Highway (NH- 131G) from Kanhauli to Sherpur (fKm. 0.000 to Km 8.480) including Junction Development with Bihta - Danapur Elevated Corridor
Physical Progress
0.0%
Drone-monitored
Financial Progress
0.0%
Of awarded cost
Awarded Cost
₹250 Cr
Contract value
Length
9.98 km
Road stretch
Schedule
On Track
On schedule
Drone Frames
1369
Aerial captures
Project Progress
Stage
Awarded, Not Appointed
Due Date
-
Likely Date
-
Completion
0.0%
Physical Done
Project Timeline
Awarded
Appointed Date Pending
Construction Started
Appointed Date Pending
In Progress
Near Completion
-
Completed
-
Physical vs Financial Progress
Project Details
UPC
N/08025/07001/BR
National Highway
131G
Regional Office
RO-Patna
State
Bihar
Mode
EPC
Length
9.98 km
Contractor
Jayshree International in JV with M/s Ajay Prakash Associates (JSI-APA)
Project Stage
Awarded, Not Appointed
Drone Frames
1369 frames
Last Flight
2026-08-27
Cost & Timeline
Awarded Cost
₹250.00 Cr
Capital Cost
₹777.79 Cr
Start Date
Appointed Date Pending
PCOD Date
-
Scheduled Completion
-
Likely Completion
-
Schedule Status
On schedule
Slippage Days
N/A
Data Updated
2026-09-13 18:58:08
Contractor Profile
Jayshree International in JV with M/s Ajay Prakash Associates (JSI-APA)
Project Intelligence
Physical progress stands at 0.0%. Financial utilization at 0.0%.
Project is on schedule or ahead of planned completion date.
Covers 9.98 km on 131G, improving regional connectivity.
1369 drone frames uploaded — real-time aerial monitoring is active for this project.
6L Patna Ring Road Highway (NH- 131G) from Kanhauli to Sherpur (fKm. 0.000 to Km 8.480) including Junction Development with Bihta - Danapur Elevated Corridor is a National Highways Authority of India (NHAI) project on 131G in Bihar. The project has an awarded cost of ₹250.00 Cr and is currently ongoing with physical progress at 0.0%.
NHAI tracks physical progress on this project through periodic drone surveys, providing an independent view of on-ground construction status. Other projects on the same highway are listed below.
Drone Imagery Available
1,369 frames · NHAI surveillance footage · UPC N/08025/07001/BR
Frequently Asked Questions
- QWhat is the current status of the NHAI project "6L Patna Ring Road Highway (NH- 131G) from Kanhauli to Sherpur (fKm. 0.000 to Km"?
- Current physical progress: 0.0%. Financial progress: 0.0%. Project stage: Awarded, Not Appointed. On schedule. Scheduled completion: -. Likely completion: -.
- QWho is the contractor for this NHAI highway project?
- The contractor for 6L Patna Ring Road Highway (NH- 131G) from Kanhauli to Sherpur (fKm. 0.000 to Km 8.480) including Junction Development with Bihta - Danapur Elevated Corridor is Jayshree International in JV with M/s Ajay Prakash Associates (JSI-APA). The project is under RO-Patna and covers 9.98 km on 131G.
- QWhat is the cost of this NHAI highway project?
- The awarded cost is ₹250.00 Crore. Total capital cost: ₹777.79 Crore. The project is on 131G in Bihar, monitored via drone surveillance by NHAI.
- QWhat is UPC N/08025/07001/BR in NHAI?
- UPC (Unique Project Code) N/08025/07001/BR refers to "6L Patna Ring Road Highway (NH- 131G) from Kanhauli to Sherpur (fKm. 0.000 to Km 8.480) including Junction Development with Bihta - Danapur Elevated Corridor " — a National Highway project on 131G in Bihar. NHAI uses UPCs to track drone monitoring progress and physical completion of highway construction.