Construction of 4 Laning Greenfield corridor from Suara (sasaram) at Ch. 0+000 to Garhani (at SH-12) at Ch 74+432, Pacakge 1 of Patna-Arrah-Sasaram Corridor of NH-119A

UPC: N/05014/02001/BR

Physical Progress

0.0%

Drone-monitored

Financial Progress

0.0%

Of awarded cost

Awarded Cost

₹901 Cr

Contract value

Length

74.432 km

Road stretch

Schedule

On Track

On schedule

Drone Frames

8657

Aerial captures

Project Progress

Physical Progress0.0%
Financial Progress0.0%

Stage

Under Construction (AD issued)

Due Date

06-09-2028

Likely Date

-

Completion

0.0%

Physical Done

DoneRemaining

Project Timeline

Awarded

07-09-2026

Construction Started

07-09-2026

In Progress

Near Completion

-

Completed

-

Physical vs Financial Progress

Project Details

UPC

N/05014/02001/BR

National Highway

119A

Regional Office

RO-Patna

State

Bihar

Mode

HAM

Length

74.432 km

Contractor

NKC Projects Private Limited

Project Stage

Under Construction (AD issued)

Drone Frames

8657 frames

Last Flight

2026-07-24

Cost & Timeline

Awarded Cost

₹900.85 Cr

Capital Cost

₹1715.94 Cr

Start Date

07-09-2026

PCOD Date

-

Scheduled Completion

06-09-2028

Likely Completion

-

Schedule Status

On schedule

Slippage Days

N/A

Data Updated

2026-09-20 21:40:12

Contractor Profile

NKC Projects Private Limited

RO-Patna119AHAM

Project Intelligence

1

Physical progress stands at 0.0%. Financial utilization at 0.0%.

2

Project is on schedule or ahead of planned completion date.

3

Covers 74.432 km on 119A, improving regional connectivity.

4

8657 drone frames uploaded — real-time aerial monitoring is active for this project.

Construction of 4 Laning Greenfield corridor from Suara (sasaram) at Ch. 0+000 to Garhani (at SH-12) at Ch 74+432, Pacakge 1 of Patna-Arrah-Sasaram Corridor of NH-119A is a National Highways Authority of India (NHAI) project on 119A in Bihar. The project has an awarded cost of ₹900.85 Cr and is currently ongoing with physical progress at 0.0%.

NHAI tracks physical progress on this project through periodic drone surveys, providing an independent view of on-ground construction status. Other projects on the same highway are listed below.

Drone Imagery Available

8,657 frames · NHAI surveillance footage · UPC N/05014/02001/BR

View Drone Images
?

Frequently Asked Questions

QWhat is the current status of the NHAI project "Construction of 4 Laning Greenfield corridor from Suara (sasaram) at Ch. 0+000 t"?
Current physical progress: 0.0%. Financial progress: 0.0%. Project stage: Under Construction (AD issued). On schedule. Scheduled completion: 06-09-2028. Likely completion: -.
QWho is the contractor for this NHAI highway project?
The contractor for Construction of 4 Laning Greenfield corridor from Suara (sasaram) at Ch. 0+000 to Garhani (at SH-12) at Ch 74+432, Pacakge 1 of Patna-Arrah-Sasaram Corridor of NH-119A is NKC Projects Private Limited. The project is under RO-Patna and covers 74.432 km on 119A.
QWhat is the cost of this NHAI highway project?
The awarded cost is ₹900.85 Crore. Total capital cost: ₹1715.94 Crore. The project is on 119A in Bihar, monitored via drone surveillance by NHAI.
QWhat is UPC N/05014/02001/BR in NHAI?
UPC (Unique Project Code) N/05014/02001/BR refers to "Construction of 4 Laning Greenfield corridor from Suara (sasaram) at Ch. 0+000 to Garhani (at SH-12) at Ch 74+432, Pacakge 1 of Patna-Arrah-Sasaram Corridor of NH-119A" — a National Highway project on 119A in Bihar. NHAI uses UPCs to track drone monitoring progress and physical completion of highway construction.