TEESTA-VI HE PROJECT, SIKKIM [500 MW], executed by LANCO TEESTA HYDRO POWER LIMITED [A wholly owned Subsidiary of NHPC LTD. acquired through NCLT]
Original Cost
₹5748 Cr
Baseline estimate
Revised Cost
₹5748 Cr
Latest approved cost
Expenditure
₹4676 Cr
Spent to date
Utilization
81.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹1072 Cr
Budget left
Budget Utilization
81.4%Spent
₹4676 Cr
Remaining
₹1072 Cr
Total
₹5748 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
07/03/2024
Revised Completion
30/09/2029
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹5748 Cr — no cost escalation recorded.
Expenditure stands at ₹4676 Cr, which is 81.4% of the revised project cost.
Remaining budget: ₹1072 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Electricity Generation. Ministry: Ministry of Power.
TEESTA-VI HE PROJECT, SIKKIM [500 MW], executed by LANCO TEESTA HYDRO POWER LIMITED [A wholly owned Subsidiary of NHPC LTD. acquired through NCLT] is a centrally-funded infrastructure project under Ministry of Power, in the Electricity Generation sector. The original approved cost is ₹5748.00 Cr, later revised to ₹5748.04 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "TEESTA-VI HE PROJECT, SIKKIM [500 MW], executed by LANCO TEESTA HYDRO POWER LIMI"?
- TEESTA-VI HE PROJECT, SIKKIM [500 MW], executed by LANCO TEESTA HYDRO POWER LIMITED [A wholly owned Subsidiary of NHPC LTD. acquired through NCLT] is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Electricity Generation. State: Sikkim. Original cost: ₹5748 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹5748 Cr has not been significantly revised. Expenditure: ₹4676 Cr (81.4% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- TEESTA-VI HE PROJECT, SIKKIM [500 MW], executed by LANCO TEE is under the Ministry of Power in the Electricity Generation sector. Project code: 602181. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. TEESTA-VI HE PROJECT, SIKKIM [500 MW], executed by LANCO TEE is one of several Bihar projects tracked under the Electricity Generation sector on the IPM system.