Meja Thermal Power Project, Stage-II , (3x800 MW)
Original Cost
₹38.4K Cr
Baseline estimate
Revised Cost
₹38.4K Cr
Latest approved cost
Expenditure
₹1028 Cr
Spent to date
Utilization
2.7%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹37.3K Cr
Budget left
Budget Utilization
2.7%Spent
₹1028 Cr
Remaining
₹37.3K Cr
Total
₹38.4K Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/12/2032
Revised Completion
Completed
Project Details
Financial Summary
Project Intelligence
Mega infrastructure project worth ₹38.4K Cr — among the largest central projects in Uttar Pradesh.
Project is within original budget of ₹38.4K Cr — no cost escalation recorded.
Expenditure stands at ₹1028 Cr, which is 2.7% of the revised project cost.
Remaining budget: ₹37.3K Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Electricity Generation. Ministry: Ministry of Power.
Meja Thermal Power Project, Stage-II , (3x800 MW) is a centrally-funded infrastructure project under Ministry of Power, in the Electricity Generation sector. The original approved cost is ₹38358.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Meja Thermal Power Project, Stage-II , (3x800 MW)"?
- Meja Thermal Power Project, Stage-II , (3x800 MW) is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Electricity Generation. State: Uttar Pradesh. Original cost: ₹38358 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹38358 Cr has not been significantly revised. Expenditure: ₹1028 Cr (2.7% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Meja Thermal Power Project, Stage-II , (3x800 MW) is under the Ministry of Power in the Electricity Generation sector. Project code: 298178. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Meja Thermal Power Project, Stage-II , (3x800 MW) is one of several Bihar projects tracked under the Electricity Generation sector on the IPM system.