Urban Public TransportIPM · Central Project#616221

Extension of Aqua Line Metro Corridor from Noida Sector-142 station to Botanical Garden, Noida of Noida Metro Rail Corporation

Ministry of Housing & Urban AffairsUttar Pradesh
Revised Cost: ₹2254 CrUtilization: 0.0%

Original Cost

₹2254 Cr

Baseline estimate

On budget

Revised Cost

₹2254 Cr

Latest approved cost

Expenditure

₹0 Cr

Spent to date

Utilization

0.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹2254 Cr

Budget left

Budget Utilization

0.0%
0%25%50%75%100%

Spent

₹0 Cr

Remaining

₹2254 Cr

Total

₹2254 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

16/03/2030

Revised Completion

Completed

Project Details

Project Code616221
SectorUrban Public Transport
MinistryMinistry of Housing & Urban Affairs
StateUttar Pradesh
Data Month2026-08

Financial Summary

Original Cost₹2254 Cr
Revised Cost₹2254 Cr
Expenditure₹0 Cr
Original End Date16/03/2030
Revised DateN/A

Project Intelligence

Project is within original budget of ₹2254 Cr — no cost escalation recorded.

Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.

Remaining budget: ₹2254 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Urban Public Transport. Ministry: Ministry of Housing & Urban Affairs.

Extension of Aqua Line Metro Corridor from Noida Sector-142 station to Botanical Garden, Noida of Noida Metro Rail Corporation is a centrally-funded infrastructure project under Ministry of Housing & Urban Affairs, in the Urban Public Transport sector. The original approved cost is ₹2254.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Extension of Aqua Line Metro Corridor from Noida Sector-142 station to Botanical"?
Extension of Aqua Line Metro Corridor from Noida Sector-142 station to Botanical Garden, Noida of Noida Metro Rail Corporation is a centrally-funded infrastructure project under the Ministry of Housing & Urban Affairs, tracked through the Investment Project Monitoring (IPM) system. Sector: Urban Public Transport. State: Uttar Pradesh. Original cost: ₹2254 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹2254 Cr has not been significantly revised. Expenditure: ₹0 Cr (N/A% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Extension of Aqua Line Metro Corridor from Noida Sector-142 is under the Ministry of Housing & Urban Affairs in the Urban Public Transport sector. Project code: 616221. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Extension of Aqua Line Metro Corridor from Noida Sector-142 is one of several Bihar projects tracked under the Urban Public Transport sector on the IPM system.