Dhaulasidh Hydro Electric Project [66 MW]
Original Cost
₹688 Cr
Baseline estimate
Revised Cost
₹1763 Cr
Latest approved cost
Expenditure
₹1285 Cr
Spent to date
Utilization
72.9%
Of revised budget
Cost Status
+156.3%
+₹1075 Cr increase
Remaining
₹478 Cr
Budget left
Budget Utilization
72.9%Spent
₹1285 Cr
Remaining
₹478 Cr
Total
₹1763 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹688 Cr
Revised Cost
₹1763 Cr
Increase
+₹1075 Cr
Escalation
+156.3%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
05/11/2025
Revised Completion
31/03/2027
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹1075 Cr (156.3%) from the original estimate of ₹688 Cr.
Expenditure stands at ₹1285 Cr, which is 72.9% of the revised project cost.
Remaining budget: ₹478 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Electricity Generation. Ministry: Ministry of Power.
Dhaulasidh Hydro Electric Project [66 MW] is a centrally-funded infrastructure project under Ministry of Power, in the Electricity Generation sector. The original approved cost is ₹688.00 Cr, later revised to ₹1763.31 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Dhaulasidh Hydro Electric Project [66 MW]"?
- Dhaulasidh Hydro Electric Project [66 MW] is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Electricity Generation. State: Himachal Pradesh. Original cost: ₹688 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹688 Cr and has been revised to ₹1763 Cr — a cost overrun of +156.3%. Expenditure to date: ₹1285 Cr (72.9% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Dhaulasidh Hydro Electric Project [66 MW] is under the Ministry of Power in the Electricity Generation sector. Project code: 602582. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Dhaulasidh Hydro Electric Project [66 MW] is one of several Bihar projects tracked under the Electricity Generation sector on the IPM system.