Bagodara Solar Power Project
Original Cost
₹339 Cr
Baseline estimate
Revised Cost
₹339 Cr
Latest approved cost
Expenditure
₹377 Cr
Spent to date
Utilization
111.1%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹0 Cr
Budget left
Budget Utilization
111.1%Spent
₹377 Cr
Remaining
₹0 Cr
Total
₹339 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/12/2025
Revised Completion
31/12/2025
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹339 Cr — no cost escalation recorded.
Expenditure stands at ₹377 Cr, which is 111.1% of the revised project cost.
Remaining budget: ₹0 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Electricity Generation. Ministry: Ministry of Power.
Bagodara Solar Power Project is a centrally-funded infrastructure project under Ministry of Power, in the Electricity Generation sector. The original approved cost is ₹339.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Bagodara Solar Power Project"?
- Bagodara Solar Power Project is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Electricity Generation. State: Gujarat. Original cost: ₹339 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹339 Cr has not been significantly revised. Expenditure: ₹377 Cr (111.1% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Bagodara Solar Power Project is under the Ministry of Power in the Electricity Generation sector. Project code: 709747. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Bagodara Solar Power Project is one of several Bihar projects tracked under the Electricity Generation sector on the IPM system.