- Project cost
- ₹4,993 Cr
- As filed on PARIVESH
- Land required
- 270.66 Ha
- Total project area
- Submitted
- 9 Oct 2026
- Filed on PARIVESH
- Documents
- 10
- PDF & KML files
About this proposal
Overview
Construction of 4 Lane at Grade/ Elevated Ganga Path connecting Sultanganj – Bhagalpur – Sabour on Hybrid Annuity Mode (Length: 41.258 km, comprising 30.518 km of at-grade/embankment section and 10.740 km of elevated section) is a Environmental Clearance (EC) proposal filed under India's PARIVESH portal, tracked here as part of BiharInfraTales' Bihar clearance monitoring dashboard. The proposal (reference number SIA/BR/INFRA2/594647/2026) was submitted by Sri Saket Kumar on behalf of Bihar state road development corporation limited in Bhagalpur, Bihar, with an estimated project cost of ₹4,993 crore spread over 270.66 hectares.
The proposal falls under the INFRA-2 sector and currently carries the status "Under Examination". Environmental Clearance is a mandatory approval from the Ministry of Environment, Forest and Climate Change (MoEFCC) or the relevant State Environment Impact Assessment Authority (SEIAA) for projects that can significantly affect the environment, and its stage-wise progress determines when construction or expansion work can lawfully begin.
The application was submitted on 2026-10-09. The land requirement comprises 0 ha of forest land and 270.66 ha of non-forest land. Full proposal documents, boundary (KML) data, and the exact project location, where published by PARIVESH, are linked on this page. This record is updated as the clearance moves through verification, appraisal, and the final grant or rejection stage.
PARIVESH data
Proposal record
- Proposal Number
- SIA/BR/INFRA2/594647/2026
- Organisation
- Bihar state road development corporation limited
- Applicant
- Sri Saket Kumar
- Sector
- INFRA-2
- Clearance Type
- EC
- Proposal Type
- EC
- Current Status
- Under Examination
- Submission Date
- 2026-10-09
- Shape of Project
- Linear
- Forest Land
- 0 Ha
- Non-Forest Land
- 270.66 Ha
Where
Project location
- District
- Bhagalpur
- State
- Bihar
- Total Land Area
- 270.66 Ha
Source files
Documents & boundary data
- Letter No 6542PDF document
- Land Survey In ProcessPDF document
- Monitoring Plan BsrdcPDF document
- Sultanganj To Bhaglapur Ham 3PDF document
- Conceptual PlanPDF document
- Pfr Ham 3PDF document
- Pfr Ham 3PDF document
- Ham 3KML boundary
- Alternative 1KML boundary
- Alternative 2 05.08.2026KML boundary
Data from the Government of India's PARIVESH environmental clearance portal.
Questions
Frequently asked questions
1What is the Environmental Clearance status of "Construction of 4 Lane at Grade/ Elevated Ganga Path connecting Sultanganj – Bha"?
As per the latest PARIVESH data, proposal SIA/BR/INFRA2/594647/2026 carries the status "Under Examination". It is a INFRA-2-sector project in Bhagalpur, Bihar.
2Who is the applicant for this Environmental Clearance proposal?
The proposal was filed by Sri Saket Kumar on behalf of Bihar state road development corporation limited. The clearance type is EC and it is tracked under PARIVESH reference SIA/BR/INFRA2/594647/2026.
3What is the project cost and land requirement?
The proposal reports an estimated cost of ₹4,993 Cr and requires 270.66 Ha of land (0 ha forest, 270.66 ha non-forest).
4What is Environmental Clearance (EC) and why does this project need it?
Environmental Clearance is a mandatory approval under India's Environment Impact Assessment (EIA) framework, granted by the MoEFCC or the State Environment Impact Assessment Authority (SEIAA) via the PARIVESH portal. Projects that can significantly affect the environment must obtain EC — covering appraisal of pollution, land use, and ecological impact — before construction or expansion can lawfully begin.