- Project cost
- ₹3,78,38,000 Cr
- As filed; the unit looks wrong
- Land required
- 9.46 Ha
- Total project area
- Submitted
- 5 Oct 2026
- Filed on PARIVESH
- Documents
- 8
- PDF & KML files
About this proposal
Overview
Anmol Industries Limited (Industrial Shed Project) is an Environmental Clearance (EC) proposal filed under India's PARIVESH single-window environmental clearance system, tracked here as part of BiharInfraTales' Bihar EC monitoring dashboard. The proposal (reference number SIA/BR/INFRA2/593547/2026) was submitted by Bimal Kumar Choudhary on behalf of ANMOL INDUSTRIES LIMITED in Kishanganj, Bihar, with a project cost entered on PARIVESH as 3,78,38,000 (the unit on the filing appears to be wrong) spread over 9.46 hectares.
The proposal falls under the INFRA-2 sector and currently carries the status "Under Verification". Environmental Clearance is a mandatory approval from the Ministry of Environment, Forest and Climate Change (MoEFCC) or the relevant State Environment Impact Assessment Authority (SEIAA) for projects that can significantly affect the environment, and its stage-wise progress determines when construction or expansion work can lawfully begin.
The application was submitted on 2026-10-05. Full proposal documents, boundary (KML) data, and the exact project location, where published by PARIVESH, are linked on this page. This record is updated as the clearance moves through verification, appraisal, and the final grant or rejection stage.
PARIVESH data
Proposal record
- Proposal Number
- SIA/BR/INFRA2/593547/2026
- Organisation
- ANMOL INDUSTRIES LIMITED
- Applicant
- Bimal Kumar Choudhary
- Sector
- INFRA-2
- Clearance Type
- EC
- Proposal Type
- EC
- Current Status
- Under Verification
- Submission Date
- 2026-10-05
Where
Project location
- District
- Kishanganj
- State
- Bihar
- Total Land Area
- 9.46 Ha
Source files
Documents & boundary data
- Land Docs UploadedPDF document
- Certificate 14PDF document
- Site PlanPDF document
- Conceptual PlanPDF document
- Clearance document 5PDF document
- Clearance document 6PDF document
- EMPPDF document
- ProjectsitefnlpariveshKML boundary
Data from the Government of India's PARIVESH environmental clearance portal.
Questions
Frequently asked questions
1What is the Environmental Clearance status of "Anmol Industries Limited (Industrial Shed Project)"?
As per the latest PARIVESH data, proposal SIA/BR/INFRA2/593547/2026 carries the status "Under Verification". It is a INFRA-2-sector project in Kishanganj, Bihar.
2Who is the applicant for this Environmental Clearance proposal?
The proposal was filed by Bimal Kumar Choudhary on behalf of ANMOL INDUSTRIES LIMITED. The clearance type is EC and it is tracked under PARIVESH reference SIA/BR/INFRA2/593547/2026.
3What is the project cost and land requirement?
The proposal reports a cost entered as 3,78,38,000 (the unit on the PARIVESH filing appears to be wrong) and requires 9.46 Ha of land.
4What is Environmental Clearance (EC) and why does this project need it?
Environmental Clearance is a mandatory approval under India's Environment Impact Assessment (EIA) framework, granted by the MoEFCC or the State Environment Impact Assessment Authority (SEIAA) via the PARIVESH portal. Projects that can significantly affect the environment must obtain EC — covering appraisal of pollution, land use, and ecological impact — before construction or expansion can lawfully begin.