National Highways Authority Of India Tenders
55 procurement notices from National Highways Authority Of India · Page 1 of 1
- ExpiredPatch repair work of Pinjor Baddi section of NH-21A (New NH-105) from Km. 4.200 to Km 17.000 in the state of Haryana
- ExpiredPatch repair work of Pinjore Baddi Nalagarh stretch of NH-21A (New NH-105) from Km 17.000 to Km 27.000 in the State of Himachal Pradesh
- ExpiredConstruction of Breast Wall on existing stretch of NH-88 (New NH-103) at Km.142.600 in the state of Himachal Pradesh.
- ExpiredConstruction of Breast Wall on existing stretch of NH-88 (New NH-103) at Km.142.990 in the state of Himachal Pradesh
- ExpiredDemarcation of PROW and Fixing of Boundary stones Pinjore-Baddi-Nalagarh section of NH-21A (New NH-105) from Km. 4.200 to Km. 35.370 in the state of Haryana and Himachal. Forth Call
- ExpiredDewatering of Tunnel-1 and fencing of Portals on Two Laning with Formation for four Lane of Proposed Shimla Bypass (Kaithlighat to Dhalli Section) of NH-22 from Km 129.050 to Km 156.507 in the State of Himachal Pradesh
- ExpiredRoad Safety Protection work at three location of Pinjore-Baddi-Nalagarh Km 4.200 to Km 21.000 section of NH 21A New NH 105 in the state of Haryana and Himachal Pradesh Emergent Work
- ExpiredEmergent Repair work of damaged bridge slab on Pinjore - Baddi Section of NH 21A(New 105) at km 8 650 in the state of Haryana
- ExpiredEmergent Repair work of damaged bridge slab on Pinjore Baddi Section of NH 21ANew 105 at km 8.650 in the state of Haryana second Call
- ExpiredFour laning of Shimla-Mataur section of NH- 88 (Now NH-205) from Km 0.000 to Km 223.700 in the State of Himachal Pradesh- Emergent filling of potholes with water bound macadam (G-I) from km. 79.000 to Km. 86.000 and on Jukhala Bridge (Ch.73.300)
- ExpiredFour laning of Shimla-Mataur NH- 88 (Old) from Km 0.000 to Km 223.700 in the State of Himachal Pradesh- Construction of Drain from Km.148.150 to km. 148.250.
- ExpiredFour laning of Shimla-Mataur section of NH- 88 (Now NH-205) from Km 0.000 to Km 223.700 in the State of Himachal Pradesh- Emergent filling of potholes with water bound macadam (G-I) from Ch. km. 60.600 to Ch. Km. 95.000.
- ExpiredEmergent Filling of Potholes with water bound macadam (G-I) from km. 141/000 to km. 147/600, 151.850 to km. 151.900, km.155.650 to Km. 156.000, Km. 169.850 to Km. 170.100.
- ExpiredEmergent filling of potholes with water bound macadam (G-I) from km. 61/000 to Km. 62/000,km. 63/500 to km. 65/600,km. 66/000 to km. 68/600,km. 69/570 to km. 72/000,km. 79/000 to km. 95/000.
- ExpiredEmergent Filling of Potholes at Selected locations on existing stretch of NH-88 (New-205,103) from Ch.60.600 to Ch.79.000 and Ch.86.000 to Ch.95.000.
- ExpiredFour-laning of Shimla-Mataur section of NH- 88 (New NH-103) from Km 0/000 to Km 223/700 in the State of Himachal Pradesh- Filling of Potholes from Ch. Km. 79.000 (Nalwar) to Ch. Km.
- ExpiredClearance of drain and culvert during rainy season on Shimla-Mataur section of NH-88 (New NH-205) from Rajghati to Kandrour from Km. 60.600 to Km. 95.000 in the State of Himachal Pradesh.
- ExpiredFour laning of Shimla-Mataur NH- 88 (New NH-205) from Km 0/000 to Km 223/700 in the State of Himachal Pradesh- Construction of Retaining Wall at Km.71.600.
- ExpiredRehabilitation and Upgradation to 4-lane road from Km. 157/000 to Km. 193/407, Jwalamukhi Bypass to Kangra Bypass up to intersection of NH 154 of Shimla to Mataur Section of NH-88 in the State of Himachal Pradesh on HAM mode-Survey and Valuation of a
- ExpiredRehabilitation and Upgradation to 4-lane road from Km. 157/000 to Km. 193/407, Jwalamukhi Bypass to Kangra Bypass up to intersection of NH 154 of Shimla to Mataur Section of NH-88 in the State of Himachal Pradesh on HAM mode-Survey and Valuation of a
- ExpiredFour laning of Shimla- Mataur Section of NH- 88 (New NH-03) from Km 0/000 to Km 223/700 in the State of Himachal Pradesh. Maintenance of existing road by filling of potholes from Km. 167.035 to Km. 171.600
- ExpiredFour laning of Shimla-Mataur NH- 88 (New NH-205) from Km 0/000 to Km 223/700 in the State of Himachal Pradesh- Construction of Retaining Wall at Km. 71.600 (2nd Call)
- ExpiredSurvey and Valuation of affected structures, and any other value addition to the land, Buildings etc. within the Proposed 4lane of Package V Jwalamukhibypasto Kangra bypass section of NH-88 (New NH-303,503) in the state of Himachal Pradesh(3rd Call).
- ExpiredFacility Service in NHAI RO and its PIU (Providing manpower viz Stenographers/Accountants...) for two years.
- ExpiredEmpanelment of Advertising Agencies for NHAI RO Shimla (H.P)
- ExpiredOperation and Maintenance of Shimla- Mataur Section of NH-205 from 0.000 to 65.000 (including Periodic Renewal from km 10.000 to km 24.000, km 30.000 to km 34.000 and km 50.000 to km 51.100) for financial Year 2022-23 in the state of H.P.
- ExpiredRehabilitation and Re-construction of 2- lane of Shimla- Mataur Section of NH-205 from Km 18.500 to km 18.615 at Ghandal landslide location on EPC mode in the state of Himachal Pradesh.
- ExpiredMaintenance work of Existing NH-21from Km 200.000 to Ch. 205.400 (excluding km 200.000 to 200.140, km 200.240 to km 200.580, km 202.560 to km 202.940) state of Himachal Pradesh at Risk and Cost of Contractor.
- ExpiredConsultancy services for Supervision Consultant for Operation and Maintenance of Four laning of Parwanoo - Solan section of NH-22 (Now NH-05) from Km 67.000 to Km 106.139, under NHDP Phase-III on EPC basis in the State of Himachal Pradesh.
- ExpiredSelection of NGOs/agencies/companies, including consortium and partnership firms to undertake various works of Avenue Plantation / Median Plantation on National Highways under NHAI Regional
- ExpiredRequest for proposal (RFP) for Appointment of Safety Consultant for Four Laning of Parwanoo-Solan Section NH-22 (New NH-05) from Km 67.000 to Km 106.139, under NHDP phase-III on EPC basis in the State of Himachal Pradesh.
- ExpiredConstruction of Two Viaducts at Km 88.440 (LHS) and Km 103.320 (LHS) at Parwanoo Solan section of NH 05 in the State of Himachal Pradesh on EPC Mode.
- ExpiredConsultancy services for Supervision Consultant for Operation and Maintenance of Up gradation of Kullu-Manali section of NH-21 (new NH-3) from Km 272.00 to Km 309.345 (Designed Chainage) on EPC mode in the state of Himachal Pradesh under NHDPPhaseIVB
- ExpiredRequest for proposal (RFP) for Appointment of Safety Consultant for Four laning of Takoli to Kullu section of NH21 Km 242.000 to Km 272.000 on EPC Mode in the State of Himachal Pradesh AND Up gradation of Kullu-Manali section of NH21 new NH3 from Km
- ExpiredRFP For Appointment of Safety Consultants for DPR Stage 4L Rajol Thanpuri(Km72to85.135)PkgIIB, 2LPS Parour Chauntra(100.84to 140.625)PkgIII, 2LPS Chauntra Padhar(140.625to180)PkgIV, 4LPS Bijni Mandi(202.815to208)PkgVB of Pathankot Mandi NH154 in HP.
- ExpiredRFP For Appointment of Safety Consultants for DPR Stage 2LPS Shimla Shalaghat(DesignCh0to27.5 Length27.5km, ExistingCh0to30 Length30km)Pkg1, 4,2LPS Shalaghat NauniChowk (DesignCh27.5to58.47 Length30.97km, Existing Length 48km)Pkg2 of NH205 in HP.
- ExpiredRFPFor AppointmentOf SafetyConsultants ForDPRStage 2LPS ShimlaShalaghat (DesignCh0to27.5, DesignLength27.5km, ExistingLength30km)Pkg1, 4,2LPS ShalaghatNauniChowk (DesignCh27.5to58.47, DesignLength30.97km, ExistingLength 48km)Pkg2 ofNH205stateHP(2Cal
- ExpiredRFP for Appointment of Safety Consultant for 4L Sihuni to Rajol from km 51 to 72 (Design Length 18.45km) (Pkg IIA) and 2L PS Padhar to Bijni from km 180 to km 202.815 (Design Length 19.05km) (Pkg VA) of Pathankot-Mandi NH-154 under NH(O) in HP on HAM
- ExpiredRFP For Appointment of Safety Consultants for Under Construction Projects i.e. 4L of Solan-Kaithlighat Km 106.139 to Km 129.050 of NH-05 in HP, 4L of End of Pinjore bypass-Nalagarh Km 4.200 to km 35.397 of NH-105 in Haryana and HP on EPC Mode.
- ExpiredRFP for Construction of 5 No. FOBs between Solan to Kaithlighat section of NH22 (Now NH 05) from Km. 106.139 to Km. 129.050 under NHDP Phase III of EPC mode in the state of Himachal Pradesh.
- ExpiredCS for SC for Operation and Maintenance of 4Laning of Parwanoo-Solan section from Km67 to Km106.139 on EPC including AE services for Construction of 2Viaducts at Km88.44(LHS)andKm103.32(LHS) atParwanoo-Solan section of NH05 in State of HP onEPC(2Call
- ExpiredRFPForAppointment OfSafetyConsultants ForDPRStage 4L Rajol Thanpuri (Km72to85.135)PkgIIB, 2LPSParourChauntra (100.84to140.625)PkgIII, 2LPSChauntraPadhar (140.625to180)PkgIV, 4LPSBijniMandi (202.815to208)PkgVB of Pathankot Mandi NH154 in HP (2nd Call)
- ExpiredAppointment of Safety Consultant for Construction of 4L Kaithlighat Shakral(Shimla Bypass PkgI Km128.835 Km146.3) and 4L Shakral Dhalli(Shimla Bypass PkgII Km146.3 Km156.56 and Shimla connectivity from Km0 Km0.725) in the state of HP on HAM mode.
- ExpiredEmpanelment of Advertising Agencies at NHAI RO Shimla (HP)
- ExpiredConstruction of 6 Nos. Foot Over Bridges (FOBs) on Parwanoo to Solan section of NH-22 (Now NH- 05) from Km. 67.000 to km 106.139 in the state of Himachal Pradesh
- ExpiredAppointment of Safety Consultant for Construction of 4L Kaithlighat Shakral(Shimla Bypass PkgI Km128.835 Km146.3) and 4L Shakral Dhalli(Shimla Bypass PkgII Km146.3 Km156.56 and Shimla connectivity from Km0 Km0.725) in the state of HP on HAM mode. (2n
- ExpiredExpression of Interest for Empanelment of Plantation Agencies to participate in tender process of Avenue Plantation Median Plantation Works along National Highways under jurisdiction of NHAI Regional Office Shimla
- ExpiredAppointment of Safety Consultant for Rehabilitation and Upgrading of Existing Road to 2LPS from end of Hamirpur to Bhangbar Section and Construction of New 2LPS of Hamirpur Bypass of NH 103,303,03 in the state of Himachal Pradesh under NHO on HAM.
- ExpiredAppointment of SafetyConsultant for Construction of 4L Kaithlighat Shakral(Shimla Bypass PkgI Km128.835 Km146.3) and 4L Shakral Dhalli(Shimla Bypass PkgII Km146.3 Km156.56 and Shimla connectivity from Km0 Km0.725) in the state of HP onHAM mode.(3rdCa
- ExpiredAppointment of Safety Consultant for Rehabilitation and Upgrading of Existing Road to 2LPS from end of Hamirpur to Bhangbar Section and Construction of New 2LPS of Hamirpur Bypass of NH 103,303,03 in the state of HP under NHO on HAM (2Call)
- ExpiredConstruction of 9 nos. FOBs between Pandoh to Manali section of NH-21 (Now NH 03) from km. 221.305 to km. 309.345 under EPC Mode in the state of Himachal Pradesh.
- ExpiredHiring of Vehicles AC Commercial on monthly rental basis at NHAI PIU Shimla
- ExpiredHiring of Vehicles (ACCommercial)
- ExpiredHiring of Vehicles (AC-Commercial) on monthly rental basis at NHAI, PIU-Shimla-2nd Call
- ExpiredHiring of Vehicles (AC-Commercial) on monthly rental basis at NHAI, PIU-Shimla-3rd Call
?
Frequently Asked Questions
- QHow many tenders has National Highways Authority Of India issued?
- National Highways Authority Of India has 55 tracked procurement notices, updated on BiharInfraTales.
- QIs this a central government department?
- Yes — National Highways Authority Of India is tracked as a central government department on BiharInfraTales's tender directory.