National Highways Authority of India||RO-Chandigarh - NHAI Tenders
472 procurement notices from National Highways Authority of India||RO-Chandigarh - NHAI · Page 2 of 8
- ExpiredConsultancy Services to carry out detailed technical assessment of the corridor to identify issues impacting the efficiency of the corridor and its Design solutions on Panipat Jalandhar section of NH1 (new NH44) from Km. 96.00 to Km. 387.100
- Expired6 Laning of PanipatJalandhar section of NH1 from Km 96 to 387.1 in the State of Haryana and Punjab to be executed as BOT Toll on DBFO Pattern under NHDP Phase-V - Repair and Maintenance of Highway between km 96 to km 212 (Balance stretches in Hr.)
- Expired6 Laning of Panipat-Jalandhar section of NH-1 from Km 96 to 387.1 in the State of Haryana and Punjab to be executed as BOT Toll on DBFO Pattern under NHDP Phase-V Repair and Maintenance of Highway between km 212 to km 387.1 (Balance stretch in pb.)
- ExpiredEmergent repair of existing 2-lane stretch from Km. 80.200 of NH-07 to Km. 33.00 of NH-62 on Malout Abohar Sadhuwali section in the State of Punjab
- ExpiredSix Laning of Panipat-Jalandhar section of NH-1 from Km 96 to 387.1in the State of Haryana and Punjab to be executed as BOT Toll on DBFO Pattern under NHDP Phase-V - Construction of balance work of Footpath works.
- ExpiredSix Laning of Panipat Jalandhar section of NH 1 from Km 96 to 387.1 in the State of Haryana and Punjab to be executed as BOT (Toll) on DBFO Pattern under NHDP Phase V Construction of balance/pending works of FOBs
- ExpiredImprovement of Jhajjar Loharu section of NH 334B Km. 130.770 to Km. 228.630 (Design Chainage 0.000 to km.97.864) (Length 97.864 km.) in the State of Haryana Improvement of section from Km 135.070 to 173.050 (Design chainage from Km. 4.300 to 42
- ExpiredConstruction of flyover at Design km 0.580 including construction of service road and resurfacing of existing Service Road at location of flyover at Design km 0.580 on Bathinda Tada Section of NH07 between Basant Vihar junction and Bhatti crossroad
- ExpiredCONSTRUCTION OF SIX LANE FLYOVER AT EXISTING KM 430.625 NEAR TANGRA TOWN AND SIX LANE VUP AT EXISTING KM 435.170 NEAR MALLIAN TOWN INCLUDING CONSTRUCTION OF NEW SERVICE ROAD AT LOCATION OF FLYOVER and VUP ON JALANDHAR AMRITSAR SECTION OF NH-01 in pb.
- Expired6-Laning of Pani-Jal section of NH-1 from Km 96 to 387.100 in the State of Haryana and Punjab to be executed as BOT (Toll) on DBFO Pattern under NHDP Phase-V-Balance BC overlay works between km. 96 to km 387.100 (Balance stretches in Pun and Har
- ExpiredConstruction of 6 lane Flyover at km 417.374 and 6 lane VUP at km 416.700 including construction of new service road on Jalandhar-Amritsar section of NH-01 for rectification of Blackspots in State of Punjab on EPC mode
- ExpiredSix Laning of Panipat-Jalandhar section from km 96.000 to 387.1 of NH-44 in the State of Haryana and Punjab to be executed on BOT (Toll) project on DBFO Pattern under NHDP Phase V - Installation of Rainwater Harvesting Systems
- ExpiredSix Laning of Panipat-Jalandhar section from km 96.000 to 387.1 of NH-44 in the State of Haryana and Punjab to be executed on BOT (Toll) project on DBFO Pattern under NHDP Phase V - Providing Highway lighting works in selected reaches
- ExpiredImprovement/Strengthening of Bhiwani to Haryana/ Rajasthan border Section of NH-709 (Extension) from km 116.570 to km 121.000 circular Road Bhiwani town in the State of Haryana
- ExpiredConstruction of Six lane Elevated highway including LVUP/VUP at Junction of Amritsar Tanda section of NH503A with Amritsar Jalandhar section of NH01 (New NH03) from km 451.120 to km. 452.810 of NH01.
- ExpiredCarrying out Independent Road Safety Audit and suggesting Rectification Measures for 25 Black Spots in the State of Punjab (2nd Call)
- ExpiredSix Laning of Panipat-Jalandhar section from km 96.000 to 387.1 of NH-44 in the State of Haryana and Punjab to be executed on BOT (Toll) project on DBFO Pattern under NHDP Phase V - Installation of Rainwater Harvesting Systems (2nd Call)
- ExpiredAppointment of Safety Consultants for (i) 4-laning of UP/Haryana border to Rohna, Sonipat section of NH-334B (ii) 4-laning of Gohana-Sonipat section of NH-352A (2nd call)
- ExpiredConstruction of 6 lane Elevated highway at km 414 at Beas at km 438.850 at Jandiyala including VUP at km 432.300 at Chouhan and flyover at km 425.880 at Khilchanon on Amritsar Jalandhar section of old NH01 on EPC mode
- ExpiredSix Laning of Panipat-Jalandhar section of NH-1 from Km 96 to 387.100 in the State of Haryana and Punjab to be executed as BOT (Toll) on DBFO Pattern under NHDP Phase-V - Balance BC overlay works between km. 96 to km 387.100 - 2nd call
- ExpiredFour laning of Hisar to Dabwali Section of NH-9 (old NH-10) from km. 170.000 to km. 227.000 with paved shoulder in the State of Haryana (Pkg-1) Construction of service road from km 217.900 to km 218.300 (BHS) at Hanspur chowk on Fatehabad bypass
- ExpiredConst. of flyover at Bharat Nagar Junction with 4 lane flyover towards ISBT and 2 lane Ramp towards railway station including resurfacing/ const. of existing Service Road of old NH95 (Section Passing thr. Ludhiana City) in the State of Punjab on EPC
- Expired4 laning of Rohtak to Hisar section of NH10 (from km 87.000 to km 170.000) including connecting link from Km 87.000 NH10 to Km 348.000 NH71 in the state of Haryana - Repair and Maintenance of project highway under risk and cost of concessionaire
- ExpiredExpression of Interest for empanelment of Plantation Agencies to participate in tender process of Plantation (Avenue and Median Plantation, Landscaping, Beautification, Transplantation and maintenance) works along National Highways
- Expired4 laning of Kaithal Rajasthan Border Section of NH 152/65 from km 33.250 (Design km 0.500) to km 241.580 (Design km 165.759) in the State of Haryana under NHDP Phase IV through Public Private Partnership (PPP) on (DBFOT) Toll basis
- Expired4-6 lanning of Kharar-Ludhiana Section of NH95 from km. 10.185 to km. 86.199 Samrala Chowk, Ludhiana in the State of Punjab on Hybrid Annuity Mode - Construction of Steel Foot over Bridge at Ch. 49.000, Khant at Ch. 30.340 and Mandera at Ch. 41.370
- ExpiredConstruction of 2 lane service road alongwith Retaining Wall at Patiala-Sanaur Junction existing VUP km 54.702 on Patiala Bypass section of NH-64 New NH 07 in the State of Punjab in EPC Mode
- ExpiredFour laning of Phagwara-Rupnagar section of NH-344 A from Km 0.00 to Km 80.820 in the State of Punjab - One time improvement of Bypassed section of Nawanshahr town from chainage 37.100 Km. to 47.100 Km
- Expired4/6 Laning of Kharar Ludhiana Section of NH-95 from Km 10.185 to Km 86.199 in the state of Punjab - One time improvement of Samrala Bypass Section
- ExpiredFour laning of Hisar to Dabwali Section of NH10 (New NH09) from Km. 227.000 to Km. 314.660 with paved shoulder - Reconstruction of Silver Jublee Chowk with reduced radius on Junction of NH09 and NH54 in Mandi Dabwali
- ExpiredConstruction of Six lane flyover at Start of Batala Bypass at km 63.320 on Amritsar Pathankot section of NH-15 (new NH-54) in the State of Punjab on EPC mode
- Expired4 laning of Ambala-Chandigarh section of NH-22 and NH-21 - Repair of distressed service road from Ch. 34.120 to Ch. 37.200 (LHS) and from Ch. 34.340 to Ch. 35.860 (RHS)
- ExpiredSix laning of Panipat-Jalandhar section of NH01 from km 96.000 to km 387.100 in the State of Haryana and Punjab - Repair to slip road (LHS) joining Kali Paltoon bridge at km 200.600 including dismantling reconstruction of retaining wall
- ExpiredFour laning of Ludhiana to Talwandi section of NH95 from km 92.000 to 170.000 (Length 78 km) in the State of Punjab - Repair and Maintenance of Project Highway at risk and cost of Concessionaire
- ExpiredWidening and Rehabilitation of the existing Patiala Bypass on NH64 and Development of 4 lane with Paved Shoulders of end of Patiala Bypass to Start of Sangrur Bypass of selection of NH64 Restoration of Damages on Service Road in Bhawanigarh
- ExpiredEmergent Patch repair work on existing 2-lane road of Amritsar-Ghoman-Tanda-Una Section of NH-503A from Design Chainage km 8.270 to Design Chainage km 85.500 (design Length 77.230 km) in the state of Punjab
- ExpiredSupply/Installation/Operation and Maintenance of Hybrid ETC system equipments at Kot Karor Toll Plaza at Km. 205.000 of Harike-Zira-Faridkot Section of NH-15 (New NH-54) the State of Punjab.
- ExpiredPriority maintenance of existing stretch of Amritsar Mehta Sri Hargobindpur Tanda Hoshiarpur Una Section of NH503A in Km. 113.925 to Km. 118.975 (PR) and Km 118.975 to Km 133.975 (Patchwork)
- ExpiredAppointment of Safety Consultants for four laning of Kaithal Rajasthan Border Section of NH 152/65 from km 33.250 (Design km 0.500) to km 241.580 (Design km 165.759) in the State of Haryana under NHDP Phase IV through PPP on DBFOT Toll basis 2nd Call
- ExpiredConstruction of 4 Lane VUP at Km 34.420, Flyover at Km 35.940 and 2 nos. FOB at Km 34.890 and Km 37.045 on Ambala-Chandigarh section of NH-22 (New NH-152) from Km 33.800 to Km 37.100 in the State of Punjab on EPC mode
- ExpiredStrengthening and Improvement of existing 2 and 4 lane with paved shoulder Jind-Karnal Section of NH-709A from Design km. 68.857 to Design 82.227 in the state of Haryana on EPC basis.
- ExpiredHiring of Vehicles on monthly basis for use of Officers of Regional Office, NHAI Chandigarh (FY 2021-22)
- ExpiredHiring of Vehicles on monthly basis for use of Officers of NHAI PIU Office Patiala
- Expired2/4 Laning of Bhiwani-Hansi-Barwala Section of NH-148B in the State of Haryana - Repair and Maintenance of highway from km 129.770 to km 163.000.
- ExpiredImprovement and Routine Maintenance of Patiala Bypass section of NH-64 (New NH-07) from km 50.000 to km 69.280 in the State of Punjab.
- ExpiredConstruction of LVUP near Dakoha railway crossing at Jalandhar City on old NH 01 (New NH 44) at Km 370.100 including entry/exit and other related works in State of Punjab on EPC mode
- ExpiredShort term repair, routine maintenance and Incident Management of Start of Sangrur Bypass to Tapa section of NH-64 (New NH-07) from km 110.720 to Km 175.000.
- ExpiredConstruction of Four Lane LVUP alongwith approaches between existing Km 172.500 to km 174.000 on Barnala-Bathinda section of old NH-64 (New NH-07) in the State of Punjab on EPC Mode
- ExpiredOperation and Maintenance of Six Laning of Panipat Jalandhar Section of NH 01 from km 96 to 387.1 in the State of Haryana and Punjab to be executed as BOT (Toll) on DBFO Pattern under NHDP Phase V (FY 2021-22)
- ExpiredMaintenance Work by Construction of Rigid Pavement Underneath Grade Separated Structure at Km 441.326 Along with Its Drainage Arrangement of Rohtak Bawal Section of NH 71 in the State of Haryana
- ExpiredMaintenance Work by Construction of Rigid Pavement Underneath Grade Separated Structure at Km 441.326 Along with Its Drainage Arrangement of Rohtak Bawal Section of NH 71 in the State of Haryana
- ExpiredShort term rectification of Blackspots Id PB02-274 Nagla Turn and PB02-275 Borha Khera Turn and repair of pavement between Km9.250 to Km13.750
- ExpiredSix Laning of Panipat-Jalandhar section of NH1 from Km 96 to 387.1 in the State of Haryana and Punjab to be executed as BOT (Toll) on DBFO Pattern under NHDP Phase-V-Construction of balance/pending works of FOBs
- ExpiredMaintenance Work by Construction of Rigid Pavement Underneath Grade Separated Structure at Km 441.326 Along with Its Drainage Arrangement of Rohtak Bawal Section of NH 71 in the State of Haryana
- ExpiredEmergency Repair work for Site Clearance, Rain Cuts with Soil, Construction from KM 130.625 to KM 135.625 section of Tanda-Hoshiarpur-Una Section of NH-503A involving construction of retaining wall, metal beam crash barrier, drain work etc.
- Expired4 laning of Hisar to Dabwali Sec of NH-10 from Km 170.000 to Km 227.000 with paved shoulder in the State of Haryana on EPC Mode. Pkg-I-Construction of service road from Km. 217.900 to Km 218.300 BHS at Hanspur Chowk on Fatehabad bypass 2nd Call
- ExpiredShort term rectification of Black Spots Id PB02274 Nagla Turn and PB02275 Borha Khera Turn and repair of pavement between Km9.250 to Km13.750 of Amb-Shahz-Naraingarh-Kala Amb sec. of NH72 (2nd Call)
- ExpiredNHAI / PIU - ASR / Ramdas - Gurdaspur / 2021
- Expired4 laning of NH-152 (Ambala-Chandigarh Section) in the State of Haryana and Punjab on BOT Basis-Construction of Foot Over Bridge (FOB) in front of Government School at Lalru (Ch.17.770)
- ExpiredConstruction/Shifting of Sewer Pipeline at Vill. Daudpura, Algon Kothi to Chung, Sursingh, Chabal Distt. Tarn Taran of Sec. Khemkaran Town to start of Amritsar Bypass from Km. 22.673 to Km. 71.496 in the state of Punjab on EPC Mode Pkg-II