Ministry of Road Transport and Highways (MoRTH) Tenders
369 procurement notices from Ministry of Road Transport and Highways — Roads & Highways sector · Page 4 of 7
- ActivePermanent Restoration of damaged portion of stretch from Km 23 00 to 24 00 and Km 44 00 to 45 00 and Km 56 00 to 60 860 and construction of additional culverts in Jalandhar kapurthala Sultanpur Lodhi Makhu road section of NH 703A in the State of Punj
- ActiveConstruction of RCC Crash Barrier Between Main Carriageway and Service Road in Km.281.00 to Km. 307.600, of N.H. 53 (Old N.H.06) in Chhattisgarh State Under Road Safety Work.
- ActiveConsultancy services for Authoritys Engineer for supervision of Balance work of the rehabilitation and upgradation from Km 33.860 to Km 67.150 of the Naldurge to Akkalkot section of NH 652 to 2 Lane with paved shoulder configuration in the state of M
- ActiveSTMC to NH-217(old NH-62) from km 133.000 to km 157.000 (TL - 25 km) for the year 2026-27 under Baghmara NH Division
- ActiveConsultancy services for Authoritys Engineer for Supervision of Work of Upgradation of Shahgarh Buxwaha Narsinghgarh Damoh section of NH-34 (from Ch 113/00 to Ch 176/500) to two lane with paved shoulders in the State of Madhya Pradesh on EPC Mode
- ActiveOne time Improvement work from Km. 46.420 to Km. 50.580 of Basrehar Market and Bharthana Chauraha to Over bridge on NH-92 Beber-Etawah Road in the State of Uttar Pradesh.
- ActiveUpgradation of road from NH-202 (Yangli Jn) to suruhuto town under Central Road Infrastructure Fund (CRIF) Scheme
- ActiveRepair and improvement of built-up section having length 7.300 Km and Maintenance work from Km 0.000 to Km 51.600 of NH-321G Agra-Jalesar Road on EPC mode in the state of Uttar Pradesh Agra Distt.
- ActiveIRQP work from Ch. 66.000 to Ch. 69.000 of NH-91A Etawah-Bela- Kannauj road in the State of Uttar Pradesh
- ActiveShort term Maintenance between Km. 221/800 to 290/200 Naliya - Narayan Sarovar Road of NH-41 in the State of Gujarat.
- Activeupgradation of Guhaghar Chiplun Helwak Road from existing Km. 00.00 to 26.890 . 40.610 to 54-260 sh78 Design Km. 00-000 to 26-230 . 40-00 to 53-600 two lane with paved shoulders on EPC basis in the State of Maharashtra
- ActiveMaintenance of Rehabilitation and upgradation of Digras Darawha Karanja NH 361C into two lanes with paved shoulder on EPC mode in the state of Maharashtra at Risk and cost
- ActiveOpen Tender Document for E-Procurement of Laboratory Equipment (NDT, Epoxy, Thermoplastic, Sign Board and Sheeting, Metal Beam Crash Barriers) for Material testing Laboratory of IAHE
- ActiveConstruction of MNB 28.880 on Digras Darwha Karanja section in (km ch.0.00 to 74.351) NH361C two lanes with paved shoulder in the state of Maharashtra. (At Risk and Cost of contractor).
- ActivePamol Khadol Road. Km.0/00 to 4/200. (FDR, Asphaltic Work, CC Road, Structure Work, Road Furniture and Miscellaneous Work) CRIF Work 2025-2026
- ActiveWidening and strengthening to 2-Lane with Paved Shoulder of NH-322 Musrigharari to Darbhanga (Km 72.05 to Km 96.00) in the state of Bihar on EPC Mode for the year 2025-26 Job No. NH-322/BHR/2025-26/132 (Including Utility Shifting).
- ExpiredProviding consultancy services for conducting FWD tests as applicable, Road Inventory NSV, CBR values etc. in lieu of preparation of Estimates,DPR for length of 15.50Kms, in the Belthangadi constituency approved under CRIF for the year 2026-27
- ExpiredProviding consultancy services for conducting FWD tests as applicable Road Inventory NSV CBR values etc in lieu of preparation of Estimates/DPR for length of 19.54 kms in the Arasikere Belur and Tarikere constituency
- ActiveConsultancy Services for Assessment of Load Carrying Capacity and Structural Soundness of Existing Bridges, including bearings, expansion joints, and allied components, along with feasibility study for transportation and maneuverability of Over Dimen
- ActiveStrengthening and Reconstruction of NH-6 (Spur) from Km 0.00 to Km 38.80 in the state of Mizoram
- ActiveConsultancy Services for Preparation of Detailed Project Report for Upgradation of 2 lane to 4 lane with Paved Shoulder for Raipur km 0 to Sarangarh km 186800 of NH130B in the state of Chhattisgarh
- ActiveConstruction of New Major HL Bridge across River ONG at Km. 43.500 on NH-26 in the State of Odisha on EPC mode
- ActiveUpgradation to 4 Lane with Paved Shoulders with Divided Carriageway from Design km 0.000 to km 37.087 of Pardi NH 48 Junction Sukesh Nanapondha Kaprada section of NH 848 in the state of Gujarat on Hybrid Annuity Mode.
- ActiveWidening and strengthening of Daringbadi ghat portion from km 231.000 to 256.000 (Design chainage from km 229.500 to 256.468) of NH-59 under NH(O) in Hybrid Annuity Mode Plan 2023-24 in the State of Odisha (Design length 26.968 Kms).
- ActiveConstruction of Four Lane with paved shoulder of Bhagalpur Kharhara Village (Dhaka More) from Km 0.000 to KM 36.600 (Total length 36.600 Km) of NH-133E in the State of Bihar on EPC mode
- ExpiredBALANCE WORK of Rehabilitation and upgradation of Karnataka AP BorderGooty section from Km 368 920 to Km 424 225 Design Ch 375 740 to 433 032 of NH 63 New NH 67 to Four lane with paved shoulder in the State of Andhra Pradesh through EPC Basis
- ActiveConstruction of 2 Lane Bridge at Km 21.206 and Km 26.983 at Bargarh District on NH-26 in the State of Odisha under EPC Mode
- ActiveWidening and strengthening of the existing 2-lane road to 2-lane road with paved shoulder from km 239.280 (Koksara) to km 294.280 (Nabarangpur) on NH-26 in Kalahandi and Nabarangpur districts in the state of Odisha under the EPC mode
- Activeup gradation to Two/four lane with paved shoulder configuration of Tuljapur Naldurge Akkalkot road from Naldurge to Akkalkot of bvalance work from Ch 30.884 and ch. 70.800 of Nh 652 on EPC mode in the state of MAharashtra
- ActiveRehabilitation and upgradation of NH 548B from km 289.300 to km 342.890 Maharashtra Karnataka Border to two lane with paved shoulder configuration in the state of Maharashtra on EPC mode Total length 52.556 km
- ActiveRepairs and Construction of PQC Road Damaged portion 14.1 Km from the work of Karnataka Maharashtra Border Km 70.682 to Akkalkot Km 106.526 and Strengthening of Dudhani Km 74.240 to 77.420 Maindargi Km 89.084 to 92.045 and Akkalkote Km 99.580 to
- ActiveWidening and strengthening to 2-Lane with Paved Shoulder of NH-322 Musrigharari to Darbhanga (Km 72.05 to Km 96.00) in the state of Bihar on EPC Mode for the year 2025-26 Job No. NH-322/BHR/2025-26/132 (Including Utility Shifting).
- ActiveUpgradation to Four lane with paved shoulder of Kalavad-Jamnagar section (Package-II) of NH-927D from Design km 0.000 (Ex. km 50.925) to Design km 47.572 (Ex. km 3.720) in the State of Gujarat on Hybrid Annuity Mode.
- ExpiredUpgradation and Reconstruction of Sirmaur - Dabhaura Section of NH-135B from Km 36/700 to Km 73/813 to two lane with paved shoulder Configuration in the State of Madhya Pradesh on EPC mode
- ExpiredConstruction of bund weir and its allied works at Ramanna Cheruvu water tank at Chadalavada village NH216 Eepurupalem to Ongole section in the State of Andhra Pradesh through the Engineering, Procurement and Construction (EPC) mode
- ExpiredUpgradation to Two lane with paved shoulders of Jasrapur-Nagali saledi singh-ked-Chhawsari-Titanwar section from design Km 16/300 to design Km 40/980
- ActiveRecontruction of Minor Bridges in km 97/540 and Ch 106/600 at Abdimandi and Kagzipura respectively near Samruddhi Mahamarg on Daulatabad T point to Khultabad Road NH 752H Taluka Khultabad Dist.Chh.Sambhajinagar.
- ExpiredShort Term Maintenance contract from Km 1/400 - 2/400, Km 7/650 -10/070, Km 10/350 - 12/400, Km 12/800 - 15/600, Km 17/560 - 18/560, Km 20/860- 21/600, Km 25/700 - 26/350, Km 27/600 - 29/790, Km 32/000 - 37/500, Km 40/400 - 41/200, Km 42/0 - 63/200
- ActiveConstruction of Bypass Road to Phulbani town from km. 29.800 (Design ch. 0.0) to km 38.500 (Design ch. 6.750) of NH-157 in the state of Odisha on EPC Mode
- ActiveConstruction of Tel Bridge with approaches at Km 126.744 of NH-26 in the state of Odisha on EPC mode
- ActiveRehabilitation and upgradation of Sarasam Kothari km 33.00 to 90.00 of NH161A length of 57.00 km to two lane with paved shoulder in the state of Maharashtra through EPC Basis Contract Risk and Cost of Contractor
- ExpiredUpgradation to 4 lanes with Paved shoulders from design km 0.850 to km 50.246 of Mahwa Mandawar Rajgarh section of NH-921 and Construction of flyover from design km 0.000 to 1.700 of NH-21 (near junction with NH 921) in the State of Rajasthan.
- ActiveRFP for the work of Widening and Strengthening from Km 0.000 to Km 38.853 of NH-330D (Sitapur to Kurain Section) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh.
- ExpiredConsultancy Services AE for supervision of Upgradation to 4LPS configuration of the Nashik to Peth section of NH-848 Length-36.371 km in the state of Maharashtra on EPC mode.
- ExpiredConsultancy Services AE for supervision of Rehabilitation and upgradation of Ghoti to Trimbak (Mokhada) section of NH-160A from km 53.500 to km 101.100 to four lane with paved shoulder configuration in the state of Maharashtra on EPC mode.
- ActiveRehabilitation Upgradation of Four Lane road with Paved Shoulders in Hingoli Town section of NH 461B from Narsi Phata to Junction with NH 161 at Sawarkheda with Major Bridge across Kayadhu river and additional 2 lane ROB at LC No.144(B) (From KM. 94.
- ActiveConstruction of four lane RoB at km 92/850 (Railway Chainage 13/9 - 14/0) of NH-351G on Amreli Bypass in the State of Gujarat on EPC mode
- ExpiredConsultancy Services for AE for Supervision of Bypass to Narsapuram town on NH216 of 2 Lane with paved shoulder configuration, starting from E Ch. Km 126.100 of NH216 old NH214A and ending at Km 10.814 existing chainage of NH216 in the State of AP
- ActiveRectification work under Risk and Cost for Repair and Maintenance of Existing Flexible Pavement in Dhanora Kothari section of NH-161A at Gokunda Village from KM 91.600 to KM 92.800 1.2 KM in Taluka Kinwat Dist Nanded in the State of Maharashtra
- ActiveCONSTRUCTION OF NEW MAJOR H.L. BRIDGE LANTH-I AT CH 113/960 Km AND LANTH -II AT CH 114/446 Km OF NH 26 IN THE STATE OF ODISHA IN EPC MODE
- ExpiredImprovement of road stretches on NH_17 from Coronation Bridge (Km 595.20 of old NH_31) to Manpong (Km 597.00 )of old NH31
- ActiveConstruction of new Major H.L. bridge utei at km. 87.900 on NH 59 in the state of Odishaon EPC mode
- ExpiredRehabilitation and Upgradation for Kopargaon to Savli Vihir section from km. 354.000 to km.362.663 Total Length 8.663 of NH 752 G to 4L.PS in the state of Maharashtra. Repairs of bad patches and diversions at the risk and cost of the contractor as p
- ActiveConstruction of H.L. Major Bridge across River Songarh at Km. 97.958 and Minor Bridge at Singkhaman Km. 87.790 on Balangir-Bhawanipatana Road (NH-26) in the State of Odisha on EPC mode
- ActiveConstruction of Proposed HL Bridge over Local Nallah at Ch 96.400 Km over Gadgadi River at Ch. 105.550 Km and Widening and Strengthening from Ch 91.720 to 91.920 Km on NH-153 (B) in the State of Odisha on EPC Mode
- ActiveConsultancy Services for AE for Supervision of Construction of a Sixlane external port connectivity road from the junction of NH65 and NH216 to Machilipatnam Port via Machilipatnam bypass section of NH216 in the state of Andhra Pradesh
- ActiveWidening to 2L and PS of balance reaches from km 184/840 to Km 190/000 and Km 194/840 to Km 198/800 including Realignment from Km 196/400 to Km 197/490 (Approx 1Km) of NH-63 in the state of Telangana on EPC mode
- ExpiredPerformance Based Maintenance Contract PBMC to two lanes with paved shoulders from Km 0.000 to Km 72.600 of Nakrekal to Thanamcherla section of NH 365 in the State of Telangana
- ExpiredReconstruction and Repair Of Major Bridge on Dhadhar River at Km. 180/000 To 180/400 on NH-64 in Bharuch District in the State of Gujarat on EPC Mode
- ActiveConstruction Of Bridges Over Kataiya Hydel Tail Race And Canal From Ch. 1.9 To Ch. 2.96 Of NH 131(106) In The State Of Bihar For The Year 2025 26 Including Utility Shifting