IRCON International Limited (IRCON) Tenders
24 procurement notices from IRCON International Limited — Railways sector · Page 1 of 1
- ActiveDesign and Construction of New BG Railway Line from Km 41.50 to Km 69.60 including Nunkhari Station involving earthwork in formation embankment cutting blanketing major bridges road under bridges viaducts and tunnels on EPC basis in Waltair Division
- ActiveIRCON_2074_Katni_Camp office building
- ActiveEoI for association with subcontractor for execution of Civil works and/or PEB works for setting up of a Rail Coach Factory (BRAHMA) on EPC basis
- ActiveDesign, Manufacture, Fabrication, Inspection, Supply, Transportation to Respective station yards incl. Installation, Testing, Commissioning, Training of Friction Buffer Stops of 6500 MT, 2000 MT suitable for heavy haul traffic...
- ActiveDESIGN SUPPLY ERECTION TESTING COMMISSIONING OF 25 KV 50 HZ SINGLE PHASE OHE TRACTION SYSTEM EXTERNAL ELECTRIFICATION SCADA WORKS FOR THE ESTABLISHMENT OF Pvt RLWY SIDING OF CSPGCL
- ActiveConsultancy for Comprehensive Assessment of Ircon International Limited and its Subsidiaries/JVs/SPVs
- ActiveSupply, Installation, Integration Testing and Commissioning of Audio Video System in 500 Seater new Auditorium Building at Department of Science and Technology, Technology Bhawan, New Mehrauli Road, New Delhi 110016
- ActiveSupply and Installation of Lubricant applicator in sharp curves of radius less than 190 mt. on elevated corridor of Chennai Metro Rail Project C4 TRK 01
- ActiveE Tender For Collection Of User Fee,refurbishment/replacement Of Tms Equipment,routine Maintenance Of Project Highway On The Basis Of Competitive Bidding At Purankhedi Toll Plaza For Shivpuri Guna Section Of NH 46... From Km... In Madhya Pradesh
- ActiveEOI For Association As JV Partner From Experienced Agencies For Gunupur Theruvali New Bg Line Project In Waltair Division Of East Coast Railway
- ActiveEOI For Association As JV Partner From Experienced Agencies For Doubling Of Track Between Bhojo And New Tinsukia Stations In Connection With Furkating - New Tinsukia Doubling Project Of Nfr In The State Of Assam
- ExpiredConstruction of doubling work incl. earth work, blanketing, minor bridges, major bridges, ROBs...........from Koderma station to Kathautia station from Ch. 000.480KM to 51.500KM Excl. Civil works of Ch. 16.430KM to 18.588KM Dhanbad Division of ECR
- ExpiredEOI for associating with IRCON as Pre-bid partner for DSITC of complete earthing system for SnT equipment inside tunnels T1 to T16 and 11 stations in the State of Uttarakhand, India.
- ActiveRepair and Maintenance works of IRCONs flats at Asiad Village, New Delhi
- ActiveRepair and Maintenance works of IRCONs flats at Vasant Kunj and San Martin Marg, Anand Vihar and Northern Region Office in Delhi, Greater Noida Depot and CIC Noida Depot
- ExpiredConstruction of Rigid Pavement and Lined Drain of Selected Roads under Imphal East Division (ED 2) Package 3 Total Road Length-122.209 km on Engineering, Procurement and Construction (EPC) Mode
- ActiveAppointment of Transaction Advisor for Monetization of Road Assets
- ExpiredOutdoor Electrical Works-Khunmoh
- ExpiredSupply,application of Loctite, Kent, Devcon or... similar product,a Thread Locker Adhesive as Anti Vibration,Anti Theft,Anti Sabotage measure for HSFG Bolts in Composite/OWG Girder Bridges in RDUM TAL RJO Addl. Bridge,Doubling Project in Mokama,Bihar
- Expirede tender for sale of 01 No Track Tamping Machine UNIMAT 8255 (Make Plasser India) Stabled at Gharghoda in Kharsia Dharmjaygarh Section ON AS IS WHERE IS BASIS
- ExpiredDesign, Supply, Installation, Commissioning and Training of Lab Equipment for MSME Extension Centers located at 06 Locations (Saran, Darbhanga, Muzaffarpur, Rohtas, Ranchi and Angul) on turnkey basis (Package-3)
- ExpiredConstruction of FOB with ramp and steps at various halt stations (12 locations) and extension of FOB with ramp (PF-1, 2 and 3) at Sheikhpura and Tilaiya of Kiul Gaya Project
- ExpiredEOI invited for assoc. as Subcon partner from Exp. Agencies for Supply of ballast..incl.laying and link. of track works..in GomohKoderma sect.bw..DHN Div,GayaSon Ngr sect.bw..DDU Div. of ECRand..in conn.with constr.of 3-4 line of SonNagar-Andal Pr.
- ExpiredEOI for association as JV Partner from Experienced Agencies for Construction of Four Lane with paved shoulder of Bhagalpur Kharhara Village Dhaka More from Km 0 to KM 36.6 Total length 36.600 Km of NH133E on EPC mode