Widening and Strengthening work for Rosera-Shivajinagar-Baryahi ghat-Baheri Road from Km. 0+000 to Km. 22+200 for the Year 2024-25.
Project Details
6 FieldsCost & Timeline
6 FieldsWidening and Strengthening work for Rosera-Shivajinagar-Baryahi ghat-Baheri Road from Km. 0+000 to Km. 22+200 for the Year 2024-25. is a Bihar Road Construction Department (RCD) project under Road Division Rosera., classified as a MDR. The agreement amount for this project is ₹63.39 Cr, and the current status is Ongoning.
RCD projects like this form part of Bihar's state highway and rural road network expansion. Other road projects under the same division are listed below.
Remarks
Work in progress. (WMM Length- 16 Km. in Widening portion work done). Box Culvert Size- 3/64/0 & 1/32/0 Raft foundation work completed and Sub structure work completed. Super Structure work in progress.
SE Inspection Log
Superintending Engineer quality visit record
Road Circle Darbhanga. · Road Division Rosera.
Visited: 18 Dec 2025"Rosera-Shivajinagar Road * Total Length: 22.20 km. * Project Scope: Widening and strengthening work under the "Pragati Yatra" initiative. The road is being converted from Single Lane to Double Lane. * Contractor: Rai Raj Construction Pvt. Ltd. * Project Timeline: Started on 06.08.2025; Scheduled completion by 05.02.2027. * Inspection Findings: * Thickness of GSB (Granular Sub-Base) and WMM (Wet Mix Macadam) was checked at km 14 and 15 in the widening section and found to be correct. * GSB and WMM work has been completed over approximately 12 km of the widening section. * Remaining work is currently in progress."
Frequently Asked Questions
- QWhat is the current status of the Bihar RCD project "Widening and Strengthening work for Rosera-Shivajinagar-Baryahi ghat-Baheri Road"?
- Status: Ongoning. This MDR project under Road Division Rosera. (Road Circle Darbhanga.) covers 22.20 km of road work. Expected completion: 05-02-2027.
- QWho is the contractor for RCD project 996?
- The contractor for this project is RAI RAJ CONSTRUCTION PRIVATE LIMITED. Project number: 996. Division: Road Division Rosera.. Administrative approval date: 15-07-2026.
- QWhat is the agreement value for this Bihar road project?
- The agreement value for "Widening and Strengthening work for Rosera-Shivajinagar-Bary" is ₹63.39 Cr. This is a MDR project under Bihar Roads Construction Department (RCD) in Road Division Rosera..
- QWhat does RCD PMIS track in Bihar?
- Bihar RCD (Road Construction Department) PMIS (Project Management Information System) tracks state highway, major district road, and rural road construction projects across Bihar. Project 996 "Widening and Strengthening work for Rosera-Shivajinagar-Bary" is one of thousands of road improvement and construction works tracked by BiharInfraTales.