MDRRCD BiharOngoning

W/S work of road from Chandani Chowk (N.H.-28) to Bakhari (N.H.-57) from 0.00 to 7.65 Km (Total Length-7.65 km) under Road Division No.-1, Muzaffarpur for the year 2024-25

#848
Road Division Muzaffarpur -1
North Bihar Road Circle Muzaffarpur
Bihar RCD PMIS — Road Project◐ Ongoning
Agreement₹69.02 Cr
Length7.65 km
Start28-07-2025
Completion27-01-2027
MDR · North Wing
Road Division Muzaffarpur -1
M/s Adarsh Construction

Project Details

6 Fields
Project No.
848
Wing
North Wing
Division
Road Division Muzaffarpur -1
Circle
North Bihar Road Circle Muzaffarpur
Road Type
MDR
Head
State Plan

Cost & Timeline

6 Fields
Agreement Value
₹69.02 Cr
Sanctioned Length
7.65 km
Contractor
M/s Adarsh Construction
AA Date
17-03-2025
Start Date
28-07-2025
Expected Completion
27-01-2027

W/S work of road from Chandani Chowk (N.H.-28) to Bakhari (N.H.-57) from 0.00 to 7.65 Km (Total Length-7.65 km) under Road Division No.-1, Muzaffarpur for the year 2024-25 is a Bihar Road Construction Department (RCD) project under Road Division Muzaffarpur -1, classified as a MDR. The agreement amount for this project is ₹69.02 Cr, and the current status is Ongoning.

RCD projects like this form part of Bihar's state highway and rural road network expansion. Other road projects under the same division are listed below.

Remarks

Work in Progress Proposal for falling & Translocation of trees have been submitted to "Parivesh Portal" on dated 17.12.2025. Work stop vide DFO Letter No. 204 dt. 24.01.2026 .NFL land demanded to DM muzaffarpur vide letter no 363 dt 10.02.2026. NFL land make available vide DM muzaffarpur letter no 3131 dt 20.04.2026. Ora postal resubmitted in parivesh portal on 2/6/2026. That Proposal accepted in PSC-I meeting at dated 16.07.2026

SE Inspection Log

Superintending Engineer quality visit record

North Bihar Road Circle Muzaffarpur · Road Division Muzaffarpur -1

Visited: 3 Sept 2026
"

"Instruction were given to take necessary action for laying mastic asphalt on bairiya round about and zero mile round about.Instruction were given to take necessary action only after improving the profile of existing crust of the path as per requirement.Instruction were given to take necessary action to vacate enchrochments of temples,police posts and school building at some places.The contractor was directed to take necessary action for gettingthe pot patch work done on the approach road SKMCH and akharaghat path on both side of bairiya golumber and zero mile."

Inspection Report PDF
?

Frequently Asked Questions

QWhat is the current status of the Bihar RCD project "W/S work of road from Chandani Chowk (N.H.-28) to Bakhari (N.H.-57) from 0.00 to"?
Status: Ongoning. This MDR project under Road Division Muzaffarpur -1 (North Bihar Road Circle Muzaffarpur) covers 7.65 km of road work. Expected completion: 27-01-2027.
QWho is the contractor for RCD project 848?
The contractor for this project is M/s Adarsh Construction. Project number: 848. Division: Road Division Muzaffarpur -1. Administrative approval date: 17-03-2025.
QWhat is the agreement value for this Bihar road project?
The agreement value for "W/S work of road from Chandani Chowk (N.H.-28) to Bakhari (N" is ₹69.02 Cr. This is a MDR project under Bihar Roads Construction Department (RCD) in Road Division Muzaffarpur -1.
QWhat does RCD PMIS track in Bihar?
Bihar RCD (Road Construction Department) PMIS (Project Management Information System) tracks state highway, major district road, and rural road construction projects across Bihar. Project 848 "W/S work of road from Chandani Chowk (N.H.-28) to Bakhari (N" is one of thousands of road improvement and construction works tracked by BiharInfraTales.