MDRRCD BiharOngoning

Widening and Strengthening of NH-83 left out portion of NH-83 from CH-81.074 to CH-98.300 (17.226 km) & CH-72.860 to CH-74.760 km (1.90 km) in district of Gaya (Actual length of road 19.126 km) for the year 2022-23 under CRF Scheme.

#564
Road Division Gaya.
Magadh Road Circle Gaya
Bihar RCD PMIS — Road Project◐ Ongoning
Agreement₹129.03 Cr
Length19.13 km
Start20-02-2023
Completion31-03-2027
MDR · South Wing
Road Division Gaya.
BABA HANS CONST. PVT. LTD.

Project Details

6 Fields
Project No.
564
Wing
South Wing
Division
Road Division Gaya.
Circle
Magadh Road Circle Gaya
Road Type
MDR
Head
State Plan

Cost & Timeline

6 Fields
Agreement Value
₹129.03 Cr
Sanctioned Length
19.13 km
Contractor
BABA HANS CONST. PVT. LTD.
AA Date
30-09-2022
Start Date
20-02-2023
Expected Completion
31-03-2027

Widening and Strengthening of NH-83 left out portion of NH-83 from CH-81.074 to CH-98.300 (17.226 km) & CH-72.860 to CH-74.760 km (1.90 km) in district of Gaya (Actual length of road 19.126 km) for the year 2022-23 under CRF Scheme. is a Bihar Road Construction Department (RCD) project under Road Division Gaya., classified as a MDR. The agreement amount for this project is ₹129.03 Cr, and the current status is Ongoning.

RCD projects like this form part of Bihar's state highway and rural road network expansion. Other road projects under the same division are listed below.

Remarks

Progress is Slow in anticipation of NOC to be issued by Forest Department. - Application has been uploaded at PARIVESH Portal for Forest Clearance on dated 02.10.2023 and its Proposal No. FP/BR/ROAD/413169/2023. - The CA land has been provided by DM, Gayaji. Accordingly proposal with required document has been submitted to CAMPA, Patna on dated: 08.09.2025 for further necessary approval. - Proposal submitted to Ministry of Environment Forest & Climate Change Department. (MoEFCC) Jharkhand on dated 09.02.2026 by MoEFCC Department Bihar. - Some Observation Raised which has been complied and the same has been forwarded to MoEFCC, Bihar .MoEFCC , Bihar has forwarded the proposal to MoEFCC Jharkhand for granting NOC. Meeting scheduled on 16.06.26. through VC mode. Observation raised related to NFL land. Compliance related to land detail is being done by RCD.( RCD submitted letter to CO for providing the detail of land) CO Report is awaited.

SE Inspection Log

Superintending Engineer quality visit record

Magadh Road Circle Gaya · Road Division Gaya.

Visited: 16 Mar 2026
"

"Regarding NH-83 Part B Inspection Report Above Mentioned"

Inspection Report PDF
?

Frequently Asked Questions

QWhat is the current status of the Bihar RCD project "Widening and Strengthening of NH-83 left out portion of NH-83 from CH-81.074 to "?
Status: Ongoning. This MDR project under Road Division Gaya. (Magadh Road Circle Gaya) covers 19.13 km of road work. Expected completion: 31-03-2027.
QWho is the contractor for RCD project 564?
The contractor for this project is BABA HANS CONST. PVT. LTD.. Project number: 564. Division: Road Division Gaya.. Administrative approval date: 30-09-2022.
QWhat is the agreement value for this Bihar road project?
The agreement value for "Widening and Strengthening of NH-83 left out portion of NH-8" is ₹129.03 Cr. This is a MDR project under Bihar Roads Construction Department (RCD) in Road Division Gaya..
QWhat does RCD PMIS track in Bihar?
Bihar RCD (Road Construction Department) PMIS (Project Management Information System) tracks state highway, major district road, and rural road construction projects across Bihar. Project 564 "Widening and Strengthening of NH-83 left out portion of NH-8" is one of thousands of road improvement and construction works tracked by BiharInfraTales.