East Central RailwayOverdue

Supply, stacking and spreading of stone ballast, linking of permanent way including transportation of P.Way materials like Rail, Sleeper, fittings etc and other associated work as per Railway's specifications and standards in connection with construction of permanent Diversion on major bridges between Saraigarh-Forbesganj section in Samastipur Division of East Central Railway.

Work #221
As of June 2026

Estimate Cost

₹5.69 Cr

Sanctioned estimate

Tendered Cost

₹5.69 Cr

0.0% vs estimate

Physical Progress

81%

Work completed

Status

Overdue

Past target DOC

East Central Railway — CAO (Con)Overdue
Tendered₹5.69 Cr
Progress81%
Started28-11-2023
Target DOC09-06-2025
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; H R Chaudhary, AEN/C/SRGR

Work Details

5 Fields
Work No.
221
Agency
M K Engineering-Guwahati
West Maligaon, Guwahati-781011, Assam, India
Acceptance / LOA
ECR-CAO-C-N-ETN-40-23-24/01112730089991 Dated 30/10/2023; ECR/ECRC/Civil/2023/0063 Dt 08.02.2024
Officer in Charge
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; H R Chaudhary, AEN/C/SRGR
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹5.69 Cr
Tendered Cost
₹5.69 Cr
Physical Progress
81%
Date Started
28-11-2023
Original DOC
09-06-2025
Extended DOC
N/A

Supply, stacking and spreading of stone ballast, linking of permanent way including transportation of P.Way materials like Rail, Sleeper, fittings etc and other associated work as per Railway's specifications and standards in connection with construction of permanent Diversion on major bridges between Saraigarh-Forbesganj section in Samastipur Division of East Central Railway. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s M K Engineering-Guwahati. The tendered cost of the work is ₹5.69 Cr, and it is currently Overdue with physical progress recorded at 81%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Supply, stacking and spreading of stone ballast, linking of permanent way includ"?
Status: Overdue (overdue). This East Central Railway work is being executed by M/s M K Engineering-Guwahati. Physical progress stands at 81%. Current date of completion (DOC): 09-06-2025.
QWho is the agency for this Bihar railway project?
The agency for this work is M/s M K Engineering-Guwahati, West Maligaon, Guwahati-781011, Assam, India. Acceptance / agreement reference: ECR-CAO-C-N-ETN-40-23-24/01112730089991 Dated 30/10/2023; ECR/ECRC/Civil/2023/0063 Dt 08.02.2024. Work started on 28-11-2023.
QWhat is the cost of this railway work?
The tendered cost of "Supply, stacking and spreading of stone ballast, linking of " is ₹5.69 Cr (against an estimate of ₹5.69 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Supply, stacking and spreading of stone ballast, linking of " is one of hundreds of railway works covered.