East Central RailwayIn Progress

Supply, Stacking and Spreading of stone ballast, linking of permanent way including transportation of P.Way materials like Rail, Sleeper, fittings etc. and other associated works as per Railway's specification and standard between Supaul-Pipra-Triveniganj of Araria-Supaul New line Project in Samastipur Division of East Central Railway.

Estimate Cost

₹59.15 Cr

Sanctioned estimate

Tendered Cost

₹59.55 Cr

+0.7% vs estimate

Physical Progress

88%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹59.55 Cr
Progress88%
Started15-02-2024
Target DOC30-06-2026
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; H R Chaudhary, AEN/C/SRGR

Work Details

5 Fields
Work No.
233
Acceptance / LOA
ECR-CAO-C-N-ETN-01-23-24/10114650095968; ECR/ECRC/Civil/2024/0030 Dt 12/04/2024
Officer in Charge
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; H R Chaudhary, AEN/C/SRGR
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹59.15 Cr
Tendered Cost
₹59.55 Cr
Physical Progress
88%
Date Started
15-02-2024
Original DOC
30-06-2026
Extended DOC
N/A

Supply, Stacking and Spreading of stone ballast, linking of permanent way including transportation of P.Way materials like Rail, Sleeper, fittings etc. and other associated works as per Railway's specification and standard between Supaul-Pipra-Triveniganj of Araria-Supaul New line Project in Samastipur Division of East Central Railway. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Jyoti Construction and Engineering Private Limited. The tendered cost of the work is ₹59.55 Cr, and it is currently In Progress with physical progress recorded at 88%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Supply, Stacking and Spreading of stone ballast, linking of permanent way includ"?
Status: In Progress. This East Central Railway work is being executed by M/s Jyoti Construction and Engineering Private Limited. Physical progress stands at 88%. Current date of completion (DOC): 30-06-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is M/s Jyoti Construction and Engineering Private Limited. Acceptance / agreement reference: ECR-CAO-C-N-ETN-01-23-24/10114650095968; ECR/ECRC/Civil/2024/0030 Dt 12/04/2024. Work started on 15-02-2024.
QWhat is the cost of this railway work?
The tendered cost of "Supply, Stacking and Spreading of stone ballast, linking of " is ₹59.55 Cr (against an estimate of ₹59.15 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Supply, Stacking and Spreading of stone ballast, linking of " is one of hundreds of railway works covered.