Supply, stacking and spreading of stone ballast, linking of permanent way including transportation of P-Way materials like Rail, Sleeper, fittings etc and other associated work as per Railway's specifications and standards in connection with New Bypass Line at Saraigarh in between New Jhajha to Baijnathpur Andauli station in Samastipur Division of E. C. Railway
Estimate Cost
₹6.60 Cr
Sanctioned estimate
Tendered Cost
₹6.00 Cr
-9.1% vs estimate
Physical Progress
95%
Work completed
Status
In Progress
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsSupply, stacking and spreading of stone ballast, linking of permanent way including transportation of P-Way materials like Rail, Sleeper, fittings etc and other associated work as per Railway's specifications and standards in connection with New Bypass Line at Saraigarh in between New Jhajha to Baijnathpur Andauli station in Samastipur Division of E. C. Railway is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s J S Company-Begusarai. The tendered cost of the work is ₹6.00 Cr, and it is currently In Progress with physical progress recorded at 95%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Frequently Asked Questions
- QWhat is the current status of the railway work "Supply, stacking and spreading of stone ballast, linking of permanent way includ"?
- Status: In Progress. This East Central Railway work is being executed by M/s J S Company-Begusarai. Physical progress stands at 95%. Current date of completion (DOC): 30-05-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s J S Company-Begusarai, At PO Bihat, Ratan Chowk, Dist Begusarai-851135, Bihar, India. Acceptance / agreement reference: LOA NO. 01053470103722 dt 22.05.2024; CA No. ECR/ECRC/Civil/2024/0104 dt 29.10.2024. Work started on 01-07-2024.
- QWhat is the cost of this railway work?
- The tendered cost of "Supply, stacking and spreading of stone ballast, linking of " is ₹6.00 Cr (against an estimate of ₹6.60 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Supply, stacking and spreading of stone ballast, linking of " is one of hundreds of railway works covered.