P-way works for Sakri Yard remodelling along with balance work of Bridge No. 55, 75A and 129 (Drop wall, Curtain wall and Boulder flooring and boulder pitching etc) in Sakri-Nirmali section in connection with gauge conversion of Sakri-Nirmali section in Samastipur Division of E. C. Railway (Source of ballast supply Pakur/Shahebganj Range)
Estimate Cost
₹4.86 Cr
Sanctioned estimate
Tendered Cost
₹4.23 Cr
-13.0% vs estimate
Physical Progress
40%
Work completed
Status
In Progress
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsP-way works for Sakri Yard remodelling along with balance work of Bridge No. 55, 75A and 129 (Drop wall, Curtain wall and Boulder flooring and boulder pitching etc) in Sakri-Nirmali section in connection with gauge conversion of Sakri-Nirmali section in Samastipur Division of E. C. Railway (Source of ballast supply Pakur/Shahebganj Range) is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s J S Company-Begusarai. The tendered cost of the work is ₹4.23 Cr, and it is currently In Progress with physical progress recorded at 40%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Remarks
tendered_cost_crore raw: 4.23/6.08
Frequently Asked Questions
- QWhat is the current status of the railway work "P-way works for Sakri Yard remodelling along with balance work of Bridge No. 55,"?
- Status: In Progress. This East Central Railway work is being executed by M/s J S Company-Begusarai. Physical progress stands at 40%. Current date of completion (DOC): 30-09-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s J S Company-Begusarai, At PO Bihat, Ratan Chowk, Dist Begusarai-851135, Bihar, India. Acceptance / agreement reference: LOA No. CAO-C-HQ-ENGINEERING/ECR-CAO-C-N-ETN-16-24-25/01053470119914 dt 23/12/2024. Work started on 05-01-2025.
- QWhat is the cost of this railway work?
- The tendered cost of "P-way works for Sakri Yard remodelling along with balance wo" is ₹4.23 Cr (against an estimate of ₹4.86 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "P-way works for Sakri Yard remodelling along with balance wo" is one of hundreds of railway works covered.