East Central RailwayIn Progress

P-way works for Sakri Yard remodelling along with balance work of Bridge No. 55, 75A and 129 (Drop wall, Curtain wall and Boulder flooring and boulder pitching etc) in Sakri-Nirmali section in connection with gauge conversion of Sakri-Nirmali section in Samastipur Division of E. C. Railway (Source of ballast supply Pakur/Shahebganj Range)

Work #257
As of June 2026

Estimate Cost

₹4.86 Cr

Sanctioned estimate

Tendered Cost

₹4.23 Cr

-13.0% vs estimate

Physical Progress

40%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹4.23 Cr
Progress40%
Started05-01-2025
Target DOC30-09-2026
Mahboob Alam, CE/C/NC/MHX; Mantu Kumar, Dy CE/C/IV/SPJ; Vinod Kumar, AXEN/Con/DBG

Work Details

5 Fields
Work No.
257
Agency
J S Company-Begusarai
At PO Bihat, Ratan Chowk, Dist Begusarai-851135, Bihar, India
Acceptance / LOA
LOA No. CAO-C-HQ-ENGINEERING/ECR-CAO-C-N-ETN-16-24-25/01053470119914 dt 23/12/2024
Officer in Charge
Mahboob Alam, CE/C/NC/MHX; Mantu Kumar, Dy CE/C/IV/SPJ; Vinod Kumar, AXEN/Con/DBG
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹4.86 Cr
Tendered Cost
₹4.23 Cr
Physical Progress
40%
Date Started
05-01-2025
Original DOC
22-06-2025
Extended DOC
30-09-2026

P-way works for Sakri Yard remodelling along with balance work of Bridge No. 55, 75A and 129 (Drop wall, Curtain wall and Boulder flooring and boulder pitching etc) in Sakri-Nirmali section in connection with gauge conversion of Sakri-Nirmali section in Samastipur Division of E. C. Railway (Source of ballast supply Pakur/Shahebganj Range) is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s J S Company-Begusarai. The tendered cost of the work is ₹4.23 Cr, and it is currently In Progress with physical progress recorded at 40%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

tendered_cost_crore raw: 4.23/6.08

?

Frequently Asked Questions

QWhat is the current status of the railway work "P-way works for Sakri Yard remodelling along with balance work of Bridge No. 55,"?
Status: In Progress. This East Central Railway work is being executed by M/s J S Company-Begusarai. Physical progress stands at 40%. Current date of completion (DOC): 30-09-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is M/s J S Company-Begusarai, At PO Bihat, Ratan Chowk, Dist Begusarai-851135, Bihar, India. Acceptance / agreement reference: LOA No. CAO-C-HQ-ENGINEERING/ECR-CAO-C-N-ETN-16-24-25/01053470119914 dt 23/12/2024. Work started on 05-01-2025.
QWhat is the cost of this railway work?
The tendered cost of "P-way works for Sakri Yard remodelling along with balance wo" is ₹4.23 Cr (against an estimate of ₹4.86 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "P-way works for Sakri Yard remodelling along with balance wo" is one of hundreds of railway works covered.