East Central RailwayIn Progress

Supply of portion and welding of (60/52KG/New/SH, 90/72 uts) rail joints by SKV process (25mm gap) on cess/in situ as per IRS specification T-19-1994 with contactors material, labour, T&P etc including welding supervisor complete between Narkatiaganj (including) to Valmikinagar (including) section in connection with Sagauli-Valmikinagar doubling Project.

Work #141
As of March 2026

Estimate Cost

₹7.29 Cr

Sanctioned estimate

Tendered Cost

₹7.14 Cr

-2.1% vs estimate

Physical Progress

24%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹7.14 Cr
Progress24%
Started31-01-2020
Target DOC31-03-2026
Indrajeet Kumar CE/C/NW/MHX; Kumar Sanu Raj, Dy. CE/Con/NKE; Harinandan Ram AEN/C/NKE

Work Details

5 Fields
Work No.
141
Agency
The India Thermit Corporation Ltd
84/22, FazalGanj, Kanpur-208012.
Acceptance / LOA
LOA No ECR/CAO/CON/North/ETN-18-19-20/5257 dt. 30.05.2019
Officer in Charge
Indrajeet Kumar CE/C/NW/MHX; Kumar Sanu Raj, Dy. CE/Con/NKE; Harinandan Ram AEN/C/NKE
Report Period
March 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹7.29 Cr
Tendered Cost
₹7.14 Cr
Physical Progress
24%
Date Started
31-01-2020
Original DOC
31-03-2026
Extended DOC
N/A

Supply of portion and welding of (60/52KG/New/SH, 90/72 uts) rail joints by SKV process (25mm gap) on cess/in situ as per IRS specification T-19-1994 with contactors material, labour, T&P etc including welding supervisor complete between Narkatiaganj (including) to Valmikinagar (including) section in connection with Sagauli-Valmikinagar doubling Project. is an East Central Railway (ECR) infrastructure work in Bihar, executed by The India Thermit Corporation Ltd.. The tendered cost of the work is ₹7.14 Cr, and it is currently In Progress with physical progress recorded at 24%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

Work in progress.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Supply of portion and welding of (60/52KG/New/SH, 90/72 uts) rail joints by SKV "?
Status: In Progress. This East Central Railway work is being executed by The India Thermit Corporation Ltd.. Physical progress stands at 24%. Current date of completion (DOC): 31-03-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is The India Thermit Corporation Ltd., 84/22, FazalGanj, Kanpur-208012.. Acceptance / agreement reference: LOA No ECR/CAO/CON/North/ETN-18-19-20/5257 dt. 30.05.2019. Work started on 31-01-2020.
QWhat is the cost of this railway work?
The tendered cost of "Supply of portion and welding of (60/52KG/New/SH, 90/72 uts)" is ₹7.14 Cr (against an estimate of ₹7.29 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Supply of portion and welding of (60/52KG/New/SH, 90/72 uts)" is one of hundreds of railway works covered.