East Central RailwayIn Progress

Supply, fabrication, erection & launching of OWG for Bridge No. 40 (1X45.7m) at Km 42.950, Bridge no. 72 (1X45.7m) at Km 54.503, Bridge No. 105 (1X45.7m) at Km 62.303, Bridge No. 156 (1X45.7m) at Km 74.823, Bridge No. 168 (3X45.7m) at Km 80.383, Bridge No. 192 (1X45.7m) at Km 87.203 in connection with construction of Hajipur-Sagauli New BG Rail Line project.

Estimate Cost

₹16.03 Cr

Sanctioned estimate

Tendered Cost

₹17.92 Cr

+11.8% vs estimate

Physical Progress

93%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹17.92 Cr
Progress93%
StartedN/A
Target DOC30-06-2026

Work Details

5 Fields
Work No.
273
Agency
Bridge Track and Tower Private Limited-Raipur
Plot No. 403 to 407 and 413 to 415, Sector A, Urla Industrial Area, 18 R.N Mukherjee Road, 6th Floor, Kolkata, Raipur-492003, Chhattisgarh, India
Acceptance / LOA
ECR/CAO/Con/WT/Agt/161 dt 01.04.21
Officer in Charge
Indrajeet Kumar, CE/C/NW; Prabhat Kumar, DyCE/C/II/HJP; Raj Kumar Mandal, AEN/C/HJP
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹16.03 Cr
Tendered Cost
₹17.92 Cr
Physical Progress
93%
Date Started
N/A
Original DOC
01-01-2022
Extended DOC
30-06-2026

Supply, fabrication, erection & launching of OWG for Bridge No. 40 (1X45.7m) at Km 42.950, Bridge no. 72 (1X45.7m) at Km 54.503, Bridge No. 105 (1X45.7m) at Km 62.303, Bridge No. 156 (1X45.7m) at Km 74.823, Bridge No. 168 (3X45.7m) at Km 80.383, Bridge No. 192 (1X45.7m) at Km 87.203 in connection with construction of Hajipur-Sagauli New BG Rail Line project. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Bridge Track and Tower Private Limited-Raipur. The tendered cost of the work is ₹17.92 Cr, and it is currently In Progress with physical progress recorded at 93%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

tendered_cost_crore raw: 17.92 after 1st variation value 19.99

?

Frequently Asked Questions

QWhat is the current status of the railway work "Supply, fabrication, erection & launching of OWG for Bridge No. 40 (1X45.7m) at "?
Status: In Progress. This East Central Railway work is being executed by M/s Bridge Track and Tower Private Limited-Raipur. Physical progress stands at 93%. Current date of completion (DOC): 30-06-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is M/s Bridge Track and Tower Private Limited-Raipur, Plot No. 403 to 407 and 413 to 415, Sector A, Urla Industrial Area, 18 R.N Mukherjee Road, 6th Floor, Kolkata, Raipur-492003, Chhattisgarh, India. Acceptance / agreement reference: ECR/CAO/Con/WT/Agt/161 dt 01.04.21.
QWhat is the cost of this railway work?
The tendered cost of "Supply, fabrication, erection & launching of OWG for Bridge " is ₹17.92 Cr (against an estimate of ₹16.03 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Supply, fabrication, erection & launching of OWG for Bridge " is one of hundreds of railway works covered.