Supply, fabrication, erection & launching of OWG for Bridge No. 40 (1X45.7m) at Km 42.950, Bridge no. 72 (1X45.7m) at Km 54.503, Bridge No. 105 (1X45.7m) at Km 62.303, Bridge No. 156 (1X45.7m) at Km 74.823, Bridge No. 168 (3X45.7m) at Km 80.383, Bridge No. 192 (1X45.7m) at Km 87.203 in connection with construction of Hajipur-Sagauli New BG Rail Line project.
Estimate Cost
₹16.03 Cr
Sanctioned estimate
Tendered Cost
₹17.92 Cr
+11.8% vs estimate
Physical Progress
93%
Work completed
Status
In Progress
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsSupply, fabrication, erection & launching of OWG for Bridge No. 40 (1X45.7m) at Km 42.950, Bridge no. 72 (1X45.7m) at Km 54.503, Bridge No. 105 (1X45.7m) at Km 62.303, Bridge No. 156 (1X45.7m) at Km 74.823, Bridge No. 168 (3X45.7m) at Km 80.383, Bridge No. 192 (1X45.7m) at Km 87.203 in connection with construction of Hajipur-Sagauli New BG Rail Line project. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Bridge Track and Tower Private Limited-Raipur. The tendered cost of the work is ₹17.92 Cr, and it is currently In Progress with physical progress recorded at 93%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Remarks
tendered_cost_crore raw: 17.92 after 1st variation value 19.99
Frequently Asked Questions
- QWhat is the current status of the railway work "Supply, fabrication, erection & launching of OWG for Bridge No. 40 (1X45.7m) at "?
- Status: In Progress. This East Central Railway work is being executed by M/s Bridge Track and Tower Private Limited-Raipur. Physical progress stands at 93%. Current date of completion (DOC): 30-06-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s Bridge Track and Tower Private Limited-Raipur, Plot No. 403 to 407 and 413 to 415, Sector A, Urla Industrial Area, 18 R.N Mukherjee Road, 6th Floor, Kolkata, Raipur-492003, Chhattisgarh, India. Acceptance / agreement reference: ECR/CAO/Con/WT/Agt/161 dt 01.04.21.
- QWhat is the cost of this railway work?
- The tendered cost of "Supply, fabrication, erection & launching of OWG for Bridge " is ₹17.92 Cr (against an estimate of ₹16.03 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Supply, fabrication, erection & launching of OWG for Bridge " is one of hundreds of railway works covered.