Construction of Station building, Service building, S&T buildings, Electrical buildings, Residential Qtrs., Approach road, High level Platform, PP shed, FOB, Circulating area, Height gauge and other Miscellaneous works between Raniganj-Jadia section (i.e. Km 28.000 to Km 51.800) in connection with new rail line project of Araria-Supaul in Samastipur division of East Central Railway.
Estimate Cost
₹100.08 Cr
Sanctioned estimate
Tendered Cost
₹91.43 Cr
-8.6% vs estimate
Physical Progress
0%
Work completed
Status
Not Started
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsConstruction of Station building, Service building, S&T buildings, Electrical buildings, Residential Qtrs., Approach road, High level Platform, PP shed, FOB, Circulating area, Height gauge and other Miscellaneous works between Raniganj-Jadia section (i.e. Km 28.000 to Km 51.800) in connection with new rail line project of Araria-Supaul in Samastipur division of East Central Railway. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Hari Construction and Associated Private Limited-Begusarai. The tendered cost of the work is ₹91.43 Cr, and it is currently Not Started with physical progress recorded at 0%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Frequently Asked Questions
- QWhat is the current status of the railway work "Construction of Station building, Service building, S&T buildings, Electrical bu"?
- Status: Not Started. This East Central Railway work is being executed by M/s Hari Construction and Associated Private Limited-Begusarai. Physical progress stands at 0%. Current date of completion (DOC): 30-06-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s Hari Construction and Associated Private Limited-Begusarai. Acceptance / agreement reference: CAO-C-HQ-ENGINEERING / ECR-CAO-C-N-ETN-32-23-24/00873270099377; ECR/ECRC/Civil/2024/0057. Work started on 11-09-2025.
- QWhat is the cost of this railway work?
- The tendered cost of "Construction of Station building, Service building, S&T buil" is ₹91.43 Cr (against an estimate of ₹100.08 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Construction of Station building, Service building, S&T buil" is one of hundreds of railway works covered.