East Central RailwayOverdue

Construction of ROB in lieu of Level crossings No. 32/C at Goldenganj, Saran

Work #271
As of June 2026

Estimate Cost

₹50.68 Cr

Sanctioned estimate

Tendered Cost

₹59.64 Cr

+17.7% vs estimate

Physical Progress

95%

Work completed

Status

Overdue

Past target DOC

East Central Railway — CAO (Con)Overdue
Tendered₹59.64 Cr
Progress95%
Started16-07-2018
Target DOC28-02-2026
Indrajeet Kumar, CE/C/NW; Prabhat Kumar, DyCE/C/II/HJP; Raj Kumar Mandal, AEN/C/HJP

Work Details

5 Fields
Work No.
271
Agency
S. P. Mallik and North Bihar (JV)
34-A, Metcalf Street, Kolkata, West Bengal
Acceptance / LOA
LoA No. ECR/CAO/Con/WT/E-tender/North/55/17-18/3919 dt 06.07.2018; Agreement ECR/CAO/Con/WT/Agt/24 dt 26.11.18
Officer in Charge
Indrajeet Kumar, CE/C/NW; Prabhat Kumar, DyCE/C/II/HJP; Raj Kumar Mandal, AEN/C/HJP
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹50.68 Cr
Tendered Cost
₹59.64 Cr
Physical Progress
95%
Date Started
16-07-2018
Original DOC
05-07-2020
Extended DOC
28-02-2026

Construction of ROB in lieu of Level crossings No. 32/C at Goldenganj, Saran is an East Central Railway (ECR) infrastructure work in Bihar, executed by S. P. Mallik and North Bihar (JV). The tendered cost of the work is ₹59.64 Cr, and it is currently Overdue with physical progress recorded at 95%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

tendered_cost_crore raw: 59.64 after 5th variation value 61.82

?

Frequently Asked Questions

QWhat is the current status of the railway work "Construction of ROB in lieu of Level crossings No. 32/C at Goldenganj, Saran"?
Status: Overdue (overdue). This East Central Railway work is being executed by S. P. Mallik and North Bihar (JV). Physical progress stands at 95%. Current date of completion (DOC): 28-02-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is S. P. Mallik and North Bihar (JV), 34-A, Metcalf Street, Kolkata, West Bengal. Acceptance / agreement reference: LoA No. ECR/CAO/Con/WT/E-tender/North/55/17-18/3919 dt 06.07.2018; Agreement ECR/CAO/Con/WT/Agt/24 dt 26.11.18. Work started on 16-07-2018.
QWhat is the cost of this railway work?
The tendered cost of "Construction of ROB in lieu of Level crossings No. 32/C at G" is ₹59.64 Cr (against an estimate of ₹50.68 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Construction of ROB in lieu of Level crossings No. 32/C at G" is one of hundreds of railway works covered.