East Central RailwayNot Started

Construction of Road over Bridge in lieu of Level crossing no. 145 at Pipra in Muzaffarpur-Sagauli section.

Estimate Cost

₹43.02 Cr

Sanctioned estimate

Tendered Cost

N/A

Awarded value

Physical Progress

0%

Work completed

Status

Not Started

Current stage

East Central Railway — CAO (Con)Not Started
TenderedN/A
Progress0%
StartedN/A
Target DOC05-06-2026
Indrajit Kumar, CE/C/NW/MHX; Avanish Sonu, Dy CE/C/I/HJP; Sri. Ravi Shankar Singh (AEN/Con/MFP-I)

Work Details

5 Fields
Work No.
268
Acceptance / LOA
LOA No. ECR-CAO-C-HQ-ENGINEERING/ECR-CAO-C-HQ-10-24-25/001146550118721 dated 06.12.2024
Officer in Charge
Indrajit Kumar, CE/C/NW/MHX; Avanish Sonu, Dy CE/C/I/HJP; Sri. Ravi Shankar Singh (AEN/Con/MFP-I)
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹43.02 Cr
Tendered Cost
N/A
Physical Progress
0%
Date Started
N/A
Original DOC
05-06-2026
Extended DOC
N/A

Construction of Road over Bridge in lieu of Level crossing no. 145 at Pipra in Muzaffarpur-Sagauli section. is an East Central Railway (ECR) infrastructure work in Bihar, executed by S.T. Construction Pvt. Ltd.-Gautam Budh Nagar-201301. it is currently Not Started with physical progress recorded at 0%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

date_work_started raw: Not started

?

Frequently Asked Questions

QWhat is the current status of the railway work "Construction of Road over Bridge in lieu of Level crossing no. 145 at Pipra in M"?
Status: Not Started. This East Central Railway work is being executed by S.T. Construction Pvt. Ltd.-Gautam Budh Nagar-201301. Physical progress stands at 0%. Current date of completion (DOC): 05-06-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is S.T. Construction Pvt. Ltd-Gautam Budh Nagar-201301. Acceptance / agreement reference: LOA No. ECR-CAO-C-HQ-ENGINEERING/ECR-CAO-C-HQ-10-24-25/001146550118721 dated 06.12.2024.
QWhat is the cost of this railway work?
Tendered cost details are not available in the current dataset for this railway work. Please refer to the official East Central Railway records.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Construction of Road over Bridge in lieu of Level crossing n" is one of hundreds of railway works covered.