Construction of platform, pp shelter, approach road and balance work of station building at Bithan, construction of RUB No.6A & 9A balance work of minor Bridge No.7,8 & 9 and other miscellaneous work between Hasanpur Road to Bithan in connection with construction of new Railway line between Sakri-Hasanpur Road.
Estimate Cost
₹6.80 Cr
Sanctioned estimate
Tendered Cost
₹7.41 Cr
+9.0% vs estimate
Physical Progress
82%
Work completed
Status
Overdue
Past target DOC
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsConstruction of platform, pp shelter, approach road and balance work of station building at Bithan, construction of RUB No.6A & 9A balance work of minor Bridge No.7,8 & 9 and other miscellaneous work between Hasanpur Road to Bithan in connection with construction of new Railway line between Sakri-Hasanpur Road. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Surendra Prasad Singh. The tendered cost of the work is ₹7.41 Cr, and it is currently Overdue with physical progress recorded at 82%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Remarks
DOC under process
Frequently Asked Questions
- QWhat is the current status of the railway work "Construction of platform, pp shelter, approach road and balance work of station "?
- Status: Overdue (overdue). This East Central Railway work is being executed by M/s Surendra Prasad Singh. Physical progress stands at 82%. Current date of completion (DOC): 31-12-2025.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s Surendra Prasad Singh, Sarvodaya Nagar, Begusarai. Acceptance / agreement reference: 19.11.2018 / ECR/CAO/Con/WT/Agt/35. Work started on 22-11-2018.
- QWhat is the cost of this railway work?
- The tendered cost of "Construction of platform, pp shelter, approach road and bala" is ₹7.41 Cr (against an estimate of ₹6.80 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Construction of platform, pp shelter, approach road and bala" is one of hundreds of railway works covered.