East Central RailwayOverdue

Linking BG track manually including dismantling MG track, carting and stacking released materials, linking level crossing, spreading of ballast, unloading 52 kg rail, spreading of PSC sleepers, linking and packing of BG points crossing etc. of Banmankhi to Bihariganj stations.

Work #175
As of June 2026

Estimate Cost

₹7.13 Cr

Sanctioned estimate

Tendered Cost

₹6.22 Cr

-12.8% vs estimate

Physical Progress

77%

Work completed

Status

Overdue

Past target DOC

East Central Railway — CAO (Con)Overdue
Tendered₹6.22 Cr
Progress77%
Started01-07-2016
Target DOC15-05-2022
Mahboob Alam, CE/C/NC/MHX; Mantu Kumar, Dy CE/C/I/SPJ; Rakesh Ranjan, AEN/C/SPJ

Work Details

5 Fields
Work No.
175
Agency
Surendra Prasad
Paras Nagar, Bagha, West Champaran-845101.
Acceptance / LOA
ECR/CAO/C/WT/04/N/16-17/8978 Dt 30.06.16 ** ECR/CAO/Con/WT/Agt/11 dt.08.09.2016.
Officer in Charge
Mahboob Alam, CE/C/NC/MHX; Mantu Kumar, Dy CE/C/I/SPJ; Rakesh Ranjan, AEN/C/SPJ
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹7.13 Cr
Tendered Cost
₹6.22 Cr
Physical Progress
77%
Date Started
01-07-2016
Original DOC
29-12-2016
Extended DOC
15-05-2022

Linking BG track manually including dismantling MG track, carting and stacking released materials, linking level crossing, spreading of ballast, unloading 52 kg rail, spreading of PSC sleepers, linking and packing of BG points crossing etc. of Banmankhi to Bihariganj stations. is an East Central Railway (ECR) infrastructure work in Bihar, executed by Surendra Prasad. The tendered cost of the work is ₹6.22 Cr, and it is currently Overdue with physical progress recorded at 77%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Linking BG track manually including dismantling MG track, carting and stacking r"?
Status: Overdue (overdue). This East Central Railway work is being executed by Surendra Prasad. Physical progress stands at 77%. Current date of completion (DOC): 15-05-2022.
QWho is the agency for this Bihar railway project?
The agency for this work is Surendra Prasad, Paras Nagar, Bagha, West Champaran-845101.. Acceptance / agreement reference: ECR/CAO/C/WT/04/N/16-17/8978 Dt 30.06.16 ** ECR/CAO/Con/WT/Agt/11 dt.08.09.2016.. Work started on 01-07-2016.
QWhat is the cost of this railway work?
The tendered cost of "Linking BG track manually including dismantling MG track, ca" is ₹6.22 Cr (against an estimate of ₹7.13 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Linking BG track manually including dismantling MG track, ca" is one of hundreds of railway works covered.