East Central RailwayCompleted

Construction of foundation, substructure & superstructure of RUB No. 79 & 108 between Supaul-Pipra, superstructure of major bridges between Supaul-Pipra and foundation, substructure & superstructure of RUB/Major bridges on well/pile foundation and other allied works between Supaul-Triveniganj section in connection with construction of Araria-Supaul New Line in Samastipur division of E.C. Railway.

Estimate Cost

₹177.63 Cr

Sanctioned estimate

Tendered Cost

₹131.98 Cr

-25.7% vs estimate

Physical Progress

100%

Work completed

Status

Completed

Current stage

East Central Railway — CAO (Con)Completed
Tendered₹131.98 Cr
Progress100%
Started15-11-2023
Target DOC31-12-2025

Work Details

5 Fields
Work No.
222
Agency
Rahee Infratech Limited-Kolkata, Kemwell Manor
5th Floor, 10/D/2 Ho-Chi-Minh Sarani, Kolkata-700071, West Bengal, India
Acceptance / LOA
ECR-CAO-C-N-ETN-03-23-24/00856500091113 Dated 15/11/2023; ECR/ECRC/Civil/2024/0021 Dt 21.03.2024
Officer in Charge
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; A K Sinha, AEN/C/DBG
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹177.63 Cr
Tendered Cost
₹131.98 Cr
Physical Progress
100%
Date Started
15-11-2023
Original DOC
31-12-2025
Extended DOC
N/A

Construction of foundation, substructure & superstructure of RUB No. 79 & 108 between Supaul-Pipra, superstructure of major bridges between Supaul-Pipra and foundation, substructure & superstructure of RUB/Major bridges on well/pile foundation and other allied works between Supaul-Triveniganj section in connection with construction of Araria-Supaul New Line in Samastipur division of E.C. Railway. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Rahee Infratech Limited-Kolkata. The tendered cost of the work is ₹131.98 Cr, and it is currently Completed with physical progress recorded at 100%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Construction of foundation, substructure & superstructure of RUB No. 79 & 108 be"?
Status: Completed. This East Central Railway work is being executed by M/s Rahee Infratech Limited-Kolkata. Physical progress stands at 100%. Current date of completion (DOC): 31-12-2025.
QWho is the agency for this Bihar railway project?
The agency for this work is M/s Rahee Infratech Limited-Kolkata, Kemwell Manor, 5th Floor, 10/D/2 Ho-Chi-Minh Sarani, Kolkata-700071, West Bengal, India. Acceptance / agreement reference: ECR-CAO-C-N-ETN-03-23-24/00856500091113 Dated 15/11/2023; ECR/ECRC/Civil/2024/0021 Dt 21.03.2024. Work started on 15-11-2023.
QWhat is the cost of this railway work?
The tendered cost of "Construction of foundation, substructure & superstructure of" is ₹131.98 Cr (against an estimate of ₹177.63 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Construction of foundation, substructure & superstructure of" is one of hundreds of railway works covered.