East Central RailwayIn Progress

Fabrication, assembling, erection, launching of Girders of Br. No. 303 (2x45.7m OWG) and Br. No. 304 (2x12.2m Composite Girder), Transportation, erection girders of Major bridges 317 (10x6.10m PSC slab), 383B (1x61.0m OWG), 383C (1x61.0m OWG) between VKNR-PNYA section and Br. No. 54 (1x45.7m OWG), Br. No. 62 (2x30.5m OWG) RXL-NKE section and other associate works between Harinagar and Valmikinagar road station and RXL-NKE-GAH section in connection with doubling of NKE-VKNR and GC work of RXL-NKE-GAH section.

Work #325
As of June 2026

Estimate Cost

₹10.95 Cr

Sanctioned estimate

Tendered Cost

₹13.68 Cr

+24.9% vs estimate

Physical Progress

85%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹13.68 Cr
Progress85%
Started05-08-2020
Target DOC10-08-2026
Vijay Kumar, CE/C/NE/MHX; Kumar Sanu Raj, Dy. CE/Con/SMI; Milan Kumar, AEN/C/NKE

Work Details

5 Fields
Work No.
325
Agency
Pilcon Engineering
16-19, Najaf Colony, Sadiqabad, Nagpur-440030, Maharashtra.
Acceptance / LOA
LOA No. ECR-CAO-C-N-ETN-119-19-20 dt. 21.07.2020
Officer in Charge
Vijay Kumar, CE/C/NE/MHX; Kumar Sanu Raj, Dy. CE/Con/SMI; Milan Kumar, AEN/C/NKE
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹10.95 Cr
Tendered Cost
₹13.68 Cr
Physical Progress
85%
Date Started
05-08-2020
Original DOC
10-08-2026
Extended DOC
N/A

Fabrication, assembling, erection, launching of Girders of Br. No. 303 (2x45.7m OWG) and Br. No. 304 (2x12.2m Composite Girder), Transportation, erection girders of Major bridges 317 (10x6.10m PSC slab), 383B (1x61.0m OWG), 383C (1x61.0m OWG) between VKNR-PNYA section and Br. No. 54 (1x45.7m OWG), Br. No. 62 (2x30.5m OWG) RXL-NKE section and other associate works between Harinagar and Valmikinagar road station and RXL-NKE-GAH section in connection with doubling of NKE-VKNR and GC work of RXL-NKE-GAH section. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/S Pilcon Engineering. The tendered cost of the work is ₹13.68 Cr, and it is currently In Progress with physical progress recorded at 85%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Fabrication, assembling, erection, launching of Girders of Br. No. 303 (2x45.7m "?
Status: In Progress. This East Central Railway work is being executed by M/S Pilcon Engineering. Physical progress stands at 85%. Current date of completion (DOC): 10-08-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is M/S Pilcon Engineering, 16-19, Najaf Colony, Sadiqabad, Nagpur-440030, Maharashtra.. Acceptance / agreement reference: LOA No. ECR-CAO-C-N-ETN-119-19-20 dt. 21.07.2020. Work started on 05-08-2020.
QWhat is the cost of this railway work?
The tendered cost of "Fabrication, assembling, erection, launching of Girders of B" is ₹13.68 Cr (against an estimate of ₹10.95 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Fabrication, assembling, erection, launching of Girders of B" is one of hundreds of railway works covered.