Earthwork in embankment, blanketing, construction of minor bridges, RUB, LHS and other allied misc. works between Mirzapur (Excl.) to Basethi (Incl.) i.e. from Km 09.0 to km 19.0 in connection with construction of new B.G. rail line between Araria-Supaul.
Estimate Cost
₹117.89 Cr
Sanctioned estimate
Tendered Cost
₹103.75 Cr
-12.0% vs estimate
Physical Progress
7%
Work completed
Status
In Progress
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsEarthwork in embankment, blanketing, construction of minor bridges, RUB, LHS and other allied misc. works between Mirzapur (Excl.) to Basethi (Incl.) i.e. from Km 09.0 to km 19.0 in connection with construction of new B.G. rail line between Araria-Supaul. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s R K Infracorp Private Limited-Hyderabad. The tendered cost of the work is ₹103.75 Cr, and it is currently In Progress with physical progress recorded at 7%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Frequently Asked Questions
- QWhat is the current status of the railway work "Earthwork in embankment, blanketing, construction of minor bridges, RUB, LHS and"?
- Status: In Progress. This East Central Railway work is being executed by M/s R K Infracorp Private Limited-Hyderabad. Physical progress stands at 7%. Current date of completion (DOC): 13-08-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s R K Infracorp Private Limited-Hyderabad. Acceptance / agreement reference: CAO-C-HQ-ENGINEERING / ECR-CAO-C-N-ETN-23-23-24/00927990099611; ECR/ECRC/Civil/2024/0082. Work started on 05-01-2025.
- QWhat is the cost of this railway work?
- The tendered cost of "Earthwork in embankment, blanketing, construction of minor b" is ₹103.75 Cr (against an estimate of ₹117.89 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Earthwork in embankment, blanketing, construction of minor b" is one of hundreds of railway works covered.