East Central RailwayIn Progress

Earthwork in embankment, blanketing, construction of minor bridges, RUB, LHS and other allied misc. works between Mirzapur (Excl.) to Basethi (Incl.) i.e. from Km 09.0 to km 19.0 in connection with construction of new B.G. rail line between Araria-Supaul.

Estimate Cost

₹117.89 Cr

Sanctioned estimate

Tendered Cost

₹103.75 Cr

-12.0% vs estimate

Physical Progress

7%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹103.75 Cr
Progress7%
Started05-01-2025
Target DOC13-08-2026
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; H R Chaudhary, AEN/C/SRGR

Work Details

5 Fields
Work No.
232
Acceptance / LOA
CAO-C-HQ-ENGINEERING / ECR-CAO-C-N-ETN-23-23-24/00927990099611; ECR/ECRC/Civil/2024/0082
Officer in Charge
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; H R Chaudhary, AEN/C/SRGR
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹117.89 Cr
Tendered Cost
₹103.75 Cr
Physical Progress
7%
Date Started
05-01-2025
Original DOC
13-08-2026
Extended DOC
N/A

Earthwork in embankment, blanketing, construction of minor bridges, RUB, LHS and other allied misc. works between Mirzapur (Excl.) to Basethi (Incl.) i.e. from Km 09.0 to km 19.0 in connection with construction of new B.G. rail line between Araria-Supaul. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s R K Infracorp Private Limited-Hyderabad. The tendered cost of the work is ₹103.75 Cr, and it is currently In Progress with physical progress recorded at 7%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Earthwork in embankment, blanketing, construction of minor bridges, RUB, LHS and"?
Status: In Progress. This East Central Railway work is being executed by M/s R K Infracorp Private Limited-Hyderabad. Physical progress stands at 7%. Current date of completion (DOC): 13-08-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is M/s R K Infracorp Private Limited-Hyderabad. Acceptance / agreement reference: CAO-C-HQ-ENGINEERING / ECR-CAO-C-N-ETN-23-23-24/00927990099611; ECR/ECRC/Civil/2024/0082. Work started on 05-01-2025.
QWhat is the cost of this railway work?
The tendered cost of "Earthwork in embankment, blanketing, construction of minor b" is ₹103.75 Cr (against an estimate of ₹117.89 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Earthwork in embankment, blanketing, construction of minor b" is one of hundreds of railway works covered.