East Central RailwayIn Progress

Earth work, blanketing, level crossing, construction of new station building and platforms at Rambhadrapur and Hayaghat station etc. in connection with diversion of major bridges No.14,15,15A,16 & 17 of SPJ-DBG section.

Estimate Cost

₹37.96 Cr

Sanctioned estimate

Tendered Cost

₹39.62 Cr

+4.4% vs estimate

Physical Progress

77%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹39.62 Cr
Progress77%
Started16-12-2016
Target DOC30-06-2026
Mahboob Alam, CE/C/NC/MHX; Mantu Kumar, Dy CE/C/I/SPJ; Rakesh Ranjan, AEN/C/SPJ

Work Details

5 Fields
Work No.
169
Agency
Hari Construction & Associates Private Limited
At & PO Keshawe, Distt-Begusarai.
Acceptance / LOA
ECR/CAO/C/wt/46/N/15-16/11003 Dt 10.11.16 ** ECR/CAO/Con/WT/Agt/22 dt. 28.02.17
Officer in Charge
Mahboob Alam, CE/C/NC/MHX; Mantu Kumar, Dy CE/C/I/SPJ; Rakesh Ranjan, AEN/C/SPJ
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹37.96 Cr
Tendered Cost
₹39.62 Cr
Physical Progress
77%
Date Started
16-12-2016
Original DOC
09-11-2018
Extended DOC
30-06-2026

Earth work, blanketing, level crossing, construction of new station building and platforms at Rambhadrapur and Hayaghat station etc. in connection with diversion of major bridges No.14,15,15A,16 & 17 of SPJ-DBG section. is an East Central Railway (ECR) infrastructure work in Bihar, executed by Hari Construction & Associates Private Limited. The tendered cost of the work is ₹39.62 Cr, and it is currently In Progress with physical progress recorded at 77%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Earth work, blanketing, level crossing, construction of new station building and"?
Status: In Progress. This East Central Railway work is being executed by Hari Construction & Associates Private Limited. Physical progress stands at 77%. Current date of completion (DOC): 30-06-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is Hari Construction & Associates Private Limited, At & PO Keshawe, Distt-Begusarai.. Acceptance / agreement reference: ECR/CAO/C/wt/46/N/15-16/11003 Dt 10.11.16 ** ECR/CAO/Con/WT/Agt/22 dt. 28.02.17. Work started on 16-12-2016.
QWhat is the cost of this railway work?
The tendered cost of "Earth work, blanketing, level crossing, construction of new " is ₹39.62 Cr (against an estimate of ₹37.96 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Earth work, blanketing, level crossing, construction of new " is one of hundreds of railway works covered.