East Central RailwayOverdue

Earth work, blanketing, and construction of 11 Nos. minor bridges, from Km26 to 38 between HYT-TLWA-LSI-DBG stations in connection with doubling of SPJ-DBG section.

Work #14
As of March 2026

Estimate Cost

₹35.60 Cr

Sanctioned estimate

Tendered Cost

₹39.61 Cr

+11.3% vs estimate

Physical Progress

90%

Work completed

Status

Overdue

Past target DOC

East Central Railway — CAO (Con)Overdue
Tendered₹39.61 Cr
Progress90%
Started21-04-2018
Target DOC10-12-2025
Mahboob Alam CE/C/NC/MHX; Vinod Kumar Gupta, Dy CE/C/I/SPJ; Vijay Shankar Singh, AEN/C/SPJ

Work Details

5 Fields
Work No.
14
Agency
PCPL & RK-JV
Rajlakshmi Palace, Sursand, Sitamarhi 883331
Acceptance / LOA
ECR/CAO/C/N/ETN-48-17-18 Dt 12.03.18 ** ECR/CAO/Con/WT/Agt/12 dt.04.7.2018
Officer in Charge
Mahboob Alam CE/C/NC/MHX; Vinod Kumar Gupta, Dy CE/C/I/SPJ; Vijay Shankar Singh, AEN/C/SPJ
Report Period
March 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹35.60 Cr
Tendered Cost
₹39.61 Cr
Physical Progress
90%
Date Started
21-04-2018
Original DOC
11-06-2019
Extended DOC
10-12-2025

Earth work, blanketing, and construction of 11 Nos. minor bridges, from Km26 to 38 between HYT-TLWA-LSI-DBG stations in connection with doubling of SPJ-DBG section. is an East Central Railway (ECR) infrastructure work in Bihar, executed by PCPL & RK-JV. The tendered cost of the work is ₹39.61 Cr, and it is currently Overdue with physical progress recorded at 90%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

Work In progress

?

Frequently Asked Questions

QWhat is the current status of the railway work "Earth work, blanketing, and construction of 11 Nos. minor bridges, from Km26 to "?
Status: Overdue (overdue). This East Central Railway work is being executed by PCPL & RK-JV. Physical progress stands at 90%. Current date of completion (DOC): 10-12-2025.
QWho is the agency for this Bihar railway project?
The agency for this work is PCPL & RK-JV, Rajlakshmi Palace, Sursand, Sitamarhi 883331. Acceptance / agreement reference: ECR/CAO/C/N/ETN-48-17-18 Dt 12.03.18 ** ECR/CAO/Con/WT/Agt/12 dt.04.7.2018. Work started on 21-04-2018.
QWhat is the cost of this railway work?
The tendered cost of "Earth work, blanketing, and construction of 11 Nos. minor br" is ₹39.61 Cr (against an estimate of ₹35.60 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Earth work, blanketing, and construction of 11 Nos. minor br" is one of hundreds of railway works covered.