East Central RailwayCompleted

Earth work, blanketing, and construction of 11 Nos. minor bridges, from Km 26 to 38 between HYT-TLWA-LSI-DBG stations in connection with doubling of SPJ-DBG section.

Estimate Cost

₹35.60 Cr

Sanctioned estimate

Tendered Cost

₹39.61 Cr

+11.3% vs estimate

Physical Progress

100%

Work completed

Status

Completed

Current stage

East Central Railway — CAO (Con)Completed
Tendered₹39.61 Cr
Progress100%
Started21-04-2018
Target DOC10-12-2025
Mahboob Alam, CE/C/NC/MHX; Mantu Kumar, Dy CE/C/I/SPJ; Rakesh Ranjan, AEN/C/SPJ

Work Details

5 Fields
Work No.
181
Acceptance / LOA
ECR/CAO/C/N/ETN-48-17-18 Dt 12.03.18 ** ECR/CAO/Con/WT/Agt/12 dt.04.7.2018
Officer in Charge
Mahboob Alam, CE/C/NC/MHX; Mantu Kumar, Dy CE/C/I/SPJ; Rakesh Ranjan, AEN/C/SPJ
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹35.60 Cr
Tendered Cost
₹39.61 Cr
Physical Progress
100%
Date Started
21-04-2018
Original DOC
11-06-2019
Extended DOC
10-12-2025

Earth work, blanketing, and construction of 11 Nos. minor bridges, from Km 26 to 38 between HYT-TLWA-LSI-DBG stations in connection with doubling of SPJ-DBG section. is an East Central Railway (ECR) infrastructure work in Bihar, executed by PCPL & RK-JV. The tendered cost of the work is ₹39.61 Cr, and it is currently Completed with physical progress recorded at 100%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Earth work, blanketing, and construction of 11 Nos. minor bridges, from Km 26 to"?
Status: Completed. This East Central Railway work is being executed by PCPL & RK-JV. Physical progress stands at 100%. Current date of completion (DOC): 10-12-2025.
QWho is the agency for this Bihar railway project?
The agency for this work is PCPL & RK-JV, Rajlakshmi Palace, Sursand, Sitamarhi-88333. Acceptance / agreement reference: ECR/CAO/C/N/ETN-48-17-18 Dt 12.03.18 ** ECR/CAO/Con/WT/Agt/12 dt.04.7.2018. Work started on 21-04-2018.
QWhat is the cost of this railway work?
The tendered cost of "Earth work, blanketing, and construction of 11 Nos. minor br" is ₹39.61 Cr (against an estimate of ₹35.60 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Earth work, blanketing, and construction of 11 Nos. minor br" is one of hundreds of railway works covered.