East Central RailwayOverdue

Earth work, blanketing, and construction of 09 Nos. minor bridges, 03 Nos major bridges (Open foundation) & 01 No. major bridge (well foundation) from Km.0 to 15 between SPJ-RBZ in connection with SPJ-DBG doubling.

Estimate Cost

₹53.01 Cr

Sanctioned estimate

Tendered Cost

₹56.37 Cr

+6.3% vs estimate

Physical Progress

91%

Work completed

Status

Overdue

Past target DOC

East Central Railway — CAO (Con)Overdue
Tendered₹56.37 Cr
Progress91%
Started18-12-2016
Target DOC31-03-2024
Mahboob Alam, CE/C/NC/MHX; Mantu Kumar, Dy CE/C/I/SPJ; Rakesh Ranjan, AEN/C/SPJ

Work Details

5 Fields
Work No.
176
Acceptance / LOA
ECR/CAO/C/WT/41/N/10731 Dt 20.10.16 ** ECR/CAO/Con/WT/Agt/23 dated 28.02.17
Officer in Charge
Mahboob Alam, CE/C/NC/MHX; Mantu Kumar, Dy CE/C/I/SPJ; Rakesh Ranjan, AEN/C/SPJ
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹53.01 Cr
Tendered Cost
₹56.37 Cr
Physical Progress
91%
Date Started
18-12-2016
Original DOC
19-10-2018
Extended DOC
31-03-2024

Earth work, blanketing, and construction of 09 Nos. minor bridges, 03 Nos major bridges (Open foundation) & 01 No. major bridge (well foundation) from Km.0 to 15 between SPJ-RBZ in connection with SPJ-DBG doubling. is an East Central Railway (ECR) infrastructure work in Bihar, executed by Hari-Triveni (JV) Hari Construction & Associates Private Limited. The tendered cost of the work is ₹56.37 Cr, and it is currently Overdue with physical progress recorded at 91%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Earth work, blanketing, and construction of 09 Nos. minor bridges, 03 Nos major "?
Status: Overdue (overdue). This East Central Railway work is being executed by Hari-Triveni (JV) Hari Construction & Associates Private Limited. Physical progress stands at 91%. Current date of completion (DOC): 31-03-2024.
QWho is the agency for this Bihar railway project?
The agency for this work is Hari-Triveni (JV) Hari Construction & Associates Private Limited, At & PO Keshawe, Distt-Begusarai.. Acceptance / agreement reference: ECR/CAO/C/WT/41/N/10731 Dt 20.10.16 ** ECR/CAO/Con/WT/Agt/23 dated 28.02.17. Work started on 18-12-2016.
QWhat is the cost of this railway work?
The tendered cost of "Earth work, blanketing, and construction of 09 Nos. minor br" is ₹56.37 Cr (against an estimate of ₹53.01 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Earth work, blanketing, and construction of 09 Nos. minor br" is one of hundreds of railway works covered.