Earth work, blanketing, and construction of 09 Nos. minor bridges, 03 Nos major bridges (Open foundation) & 01 No. major bridge (well foundation) from Km.0 to 15 between SPJ-RBZ in connection with SPJ-DBG doubling.
Estimate Cost
₹53.01 Cr
Sanctioned estimate
Tendered Cost
₹56.37 Cr
+6.3% vs estimate
Physical Progress
91%
Work completed
Status
Overdue
Past target DOC
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsEarth work, blanketing, and construction of 09 Nos. minor bridges, 03 Nos major bridges (Open foundation) & 01 No. major bridge (well foundation) from Km.0 to 15 between SPJ-RBZ in connection with SPJ-DBG doubling. is an East Central Railway (ECR) infrastructure work in Bihar, executed by Hari-Triveni (JV) Hari Construction & Associates Private Limited. The tendered cost of the work is ₹56.37 Cr, and it is currently Overdue with physical progress recorded at 91%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Frequently Asked Questions
- QWhat is the current status of the railway work "Earth work, blanketing, and construction of 09 Nos. minor bridges, 03 Nos major "?
- Status: Overdue (overdue). This East Central Railway work is being executed by Hari-Triveni (JV) Hari Construction & Associates Private Limited. Physical progress stands at 91%. Current date of completion (DOC): 31-03-2024.
- QWho is the agency for this Bihar railway project?
- The agency for this work is Hari-Triveni (JV) Hari Construction & Associates Private Limited, At & PO Keshawe, Distt-Begusarai.. Acceptance / agreement reference: ECR/CAO/C/WT/41/N/10731 Dt 20.10.16 ** ECR/CAO/Con/WT/Agt/23 dated 28.02.17. Work started on 18-12-2016.
- QWhat is the cost of this railway work?
- The tendered cost of "Earth work, blanketing, and construction of 09 Nos. minor br" is ₹56.37 Cr (against an estimate of ₹53.01 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Earth work, blanketing, and construction of 09 Nos. minor br" is one of hundreds of railway works covered.